{"id":8156,"date":"2026-11-11T09:53:27","date_gmt":"2026-11-11T09:53:27","guid":{"rendered":"https:\/\/www.ggsteelstruct.com\/?post_type=product&#038;p=8156"},"modified":"2026-11-20T04:02:14","modified_gmt":"2026-11-20T04:02:14","slug":"pre-engineered-steel-warehouse","status":"publish","type":"product","link":"https:\/\/www.ggsteelstruct.com\/es\/products\/pre-engineered-steel-warehouse\/","title":{"rendered":"Almac\u00e9n de Acero Prefabricado"},"content":{"rendered":"<p>Un almac\u00e9n de acero preingenierizado se construye con marcos de secciones H armadas c\u00f3nicas, correas conformadas en fr\u00edo y recubrimiento met\u00e1lico, todos cortados, soldados, perforados y pintados en nuestra f\u00e1brica antes del env\u00edo. Debido a que el marco sigue el diagrama de momento flector de cada elemento, el peso del acero se mantiene bajo mientras el vano libre permanece amplio \u2014 un almac\u00e9n t\u00edpico con estructura de p\u00f3rtico de 4\u20138 m de altura de alero usa aproximadamente 30\u201340 kg\/m\u00b2 de \u00e1rea de piso, y 40\u201350 kg\/m\u00b2 a 10\u201313 m.<\/p>\n<p>Cada almac\u00e9n se dise\u00f1a en funci\u00f3n de las cargas del sitio y la forma en que el edificio ser\u00e1 usado realmente: disposici\u00f3n del estanter\u00eda, tr\u00e1fico de montacargas, despeje para rociadores contra incendios, futura instalaci\u00f3n de energ\u00eda fotovoltaica en el techo y expansi\u00f3n en cualquiera de los extremos de hastiales.<\/p>\n<h2>Especificaciones Clave<\/h2>\n<table>\n<tbody>\n<tr>\n<td><strong>Luz libre<\/strong><\/td>\n<td>Vano simple de 18 \u2013 48 m; dise\u00f1os multivano hasta 120 m de ancho<\/td>\n<\/tr>\n<tr>\n<td><strong>Altura al alero<\/strong><\/td>\n<td>6 \u2013 12 m est\u00e1ndar; 4 m m\u00ednimo para tiendas peque\u00f1as<\/td>\n<\/tr>\n<tr>\n<td><strong>Inclinaci\u00f3n del techo<\/strong><\/td>\n<td>5% \u2013 10% (1:20 a 1:10)<\/td>\n<\/tr>\n<tr>\n<td><strong>Estructura<\/strong><\/td>\n<td>Marcos de p\u00f3rtico con secciones H soldadas c\u00f3nicas, columnas laminadas en caliente cuando se requiera<\/td>\n<\/tr>\n<tr>\n<td><strong>Elementos secundarios<\/strong><\/td>\n<td>Correas y montantes C\/Z conformados en fr\u00edo, pre-galvanizados Z275<\/td>\n<\/tr>\n<tr>\n<td><strong>Recubrimiento<\/strong><\/td>\n<td>L\u00e1mina de acero color de 0.4 \u2013 0.6 mm, panel s\u00e1ndwich de 50 \u2013 100 mm, o panel ALC<\/td>\n<\/tr>\n<tr>\n<td><strong>Grado de acero<\/strong><\/td>\n<td>Marco principal Q355B, secundarios Q235B; S355JR \/ A572 Gr.50 bajo pedido<\/td>\n<\/tr>\n<tr>\n<td><strong>C\u00f3digos de dise\u00f1o<\/strong><\/td>\n<td>GB 50017 \/ GB 51022, AISC \/ ASCE 7, Euroc\u00f3digo 3, AS\/NZS 4600<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Datos de dise\u00f1o que necesitamos de usted<\/h2>\n<p>Uso del edificio y disposici\u00f3n de estanter\u00edas o entrepiso, ubicaci\u00f3n del sitio y velocidad de viento de dise\u00f1o, carga de nieve y categor\u00eda s\u00edsmica, dimensiones del plano (largo \u00d7 ancho), altura de alero y pendiente de techo, tama\u00f1os de puertas y ventanas, capacidad de gr\u00faa si hay, y tipo de recubrimiento preferido. Un boceto a mano con dimensiones es suficiente para iniciar.<\/p>\n<h2>Detalles que deciden el costo<\/h2>\n<ul>\n<li>La altura del alero es el factor principal: un marco de 10\u201313 m lleva aproximadamente 20% m\u00e1s acero que el mismo vano a 4\u20138 m.<\/li>\n<li>Vano libre versus columnas internas \u2014 un vano libre de 36 m cuesta m\u00e1s acero que dos vanos de 18 m con columna central, pero mantiene el piso libre para estanter\u00edas.<\/li>\n<li>El espaciamiento de columnas de 6\u20138 m es adecuado para la mayor\u00eda de almacenes; vanos m\u00e1s anchos reducen el n\u00famero de marcos pero requieren correas y vigas de gr\u00faa m\u00e1s pesadas.<\/li>\n<li>Espacio para rociadores: NFPA 13 generalmente requiere al menos 457 mm (18 pulg) entre la parte superior del almacenamiento y el deflector del rociador, y 914 mm (36 pulg) para algunos tipos de cabezales como ESFR \u2014 confirme con la certificaci\u00f3n del cabezal que use.<\/li>\n<li>El PV en el techo a\u00f1ade una carga permanente de aproximadamente 15\u201325 kg\/m\u00b2 para m\u00f3dulos m\u00e1s montaje, y m\u00e1s para sistemas con lastre.<\/li>\n<\/ul>\n<h2>Entrega y montaje<\/h2>\n<p>Los marcos principales se env\u00edan en contenedores abiertos de 40 pies o plataformas, los elementos secundarios y paneles se agrupan y cada pieza lleva un n\u00famero de marca que coincide con el plano de montaje. La fabricaci\u00f3n est\u00e1ndar es de 25\u201335 d\u00edas tras la aprobaci\u00f3n del plano. El trabajo en sitio es atornillado, por lo que un equipo de 8\u201312 personas puede t\u00edpicamente montar 1,000\u20131,500 m\u00b2 por semana una vez que las cimentaciones y pernos de anclaje est\u00e1n listos.<\/p>","protected":false},"excerpt":{"rendered":"<p>Un almac\u00e9n de acero prefabricado en f\u00e1brica, dise\u00f1ado para almacenamiento, distribuci\u00f3n y fabricaci\u00f3n ligera. Dise\u00f1amos, fabricamos y enviamos el paquete completo del edificio, por lo que su equipo solo tendr\u00e1 que ensamblarlo con pernos en el lugar de instalaci\u00f3n.<\/p>","protected":false},"featured_media":6392,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_aseo_title":"Pre-Engineered Steel Warehouse Building | GG Steel","_aseo_desc":"Factory-built steel warehouses for storage, distribution and light manufacturing. Tapered frames, purlins and cladding shipped as a bolt-together kit.","_aseo_noindex":false,"_aseo_og_image":0,"_aseo_schema_type":""},"product_cat":[48,36],"class_list":["post-8156","product","type-product","status-publish","has-post-thumbnail","hentry","product_cat-hot-sales","product_cat-steel-warehouse"],"acf":{"gallery":[6409,6390,6412],"gallery_source":{"label":"Gallery","type":"gallery","formatted_value":[{"ID":6409,"id":6409,"title":"warehouse-construction","filename":"warehouse-construction.webp","filesize":140916,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction.webp","link":"https:\/\/www.ggsteelstruct.com\/es\/products\/pre-engineered-steel-warehouse\/warehouse-construction\/","alt":"warehouse construction","author":"1","description":"","caption":"","name":"warehouse-construction","status":"inherit","uploaded_to":8156,"date":"2026-11-01 18:14:36","modified":"2026-11-11 09:52:37","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":1021,"height":575,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction-300x169.webp","medium-width":300,"medium-height":169,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction-768x433.webp","medium_large-width":768,"medium_large-height":433,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction.webp","large-width":1021,"large-height":575,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction.webp","1536x1536-width":1021,"1536x1536-height":575,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction.webp","2048x2048-width":1021,"2048x2048-height":575,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction-18x10.webp","trp-custom-language-flag-width":18,"trp-custom-language-flag-height":10}},{"ID":6390,"id":6390,"title":"completed-industrial-building-460","filename":"completed-industrial-building-460.webp","filesize":105234,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460.webp","link":"https:\/\/www.ggsteelstruct.com\/es\/products\/pre-engineered-steel-warehouse\/completed-industrial-building-460\/","alt":"completed industrial building 460","author":"1","description":"","caption":"","name":"completed-industrial-building-460","status":"inherit","uploaded_to":8156,"date":"2026-11-01 18:14:20","modified":"2026-11-11 09:52:37","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":1200,"height":1200,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-300x300.webp","medium-width":300,"medium-height":300,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-768x768.webp","medium_large-width":768,"medium_large-height":768,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-1024x1024.webp","large-width":1024,"large-height":1024,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460.webp","1536x1536-width":1200,"1536x1536-height":1200,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460.webp","2048x2048-width":1200,"2048x2048-height":1200,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-12x12.webp","trp-custom-language-flag-width":12,"trp-custom-language-flag-height":12}},{"ID":6412,"id":6412,"title":"industrial-steel-frame-326","filename":"industrial-steel-frame-326.webp","filesize":199928,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326.webp","link":"https:\/\/www.ggsteelstruct.com\/es\/products\/pre-engineered-steel-warehouse\/industrial-steel-frame-326\/","alt":"industrial steel frame 326","author":"1","description":"","caption":"","name":"industrial-steel-frame-326","status":"inherit","uploaded_to":8156,"date":"2026-11-01 18:14:38","modified":"2026-11-11 09:52:37","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":944,"height":709,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326-300x225.webp","medium-width":300,"medium-height":225,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326-768x577.webp","medium_large-width":768,"medium_large-height":577,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326.webp","large-width":944,"large-height":709,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326.webp","1536x1536-width":944,"1536x1536-height":709,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326.webp","2048x2048-width":944,"2048x2048-height":709,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326-16x12.webp","trp-custom-language-flag-width":16,"trp-custom-language-flag-height":12}}]},"downloads":[{"title":"Guiguan Steel Structure Brochure 2024","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-steel-brochure-2024.pdf"},{"title":"Perfil de la Empresa Guiguan Estructuras Met\u00e1licas","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-company-profile.pdf"}],"downloads_source":{"label":"Downloads","type":"repeater","formatted_value":[{"title":"Guiguan Steel Structure Brochure 2024","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-steel-brochure-2024.pdf"},{"title":"Perfil de la Empresa Guiguan Estructuras Met\u00e1licas","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-company-profile.pdf"}]},"spec_table":"<table><tbody><tr><td><strong>Span<\/strong><\/td><td>18 \u2013 48 m clear span (multi-span up to 120 m)<\/td><\/tr><tr><td><strong>Eave Height<\/strong><\/td><td>6 \u2013 12 m, extendable<\/td><\/tr><tr><td><strong>Structure<\/strong><\/td><td>portal-frame<\/td><\/tr><tr><td><strong>Main Material<\/strong><\/td><td>Q355B built-up H sections, hot-rolled columns, Q235B secondary members<\/td><\/tr><tr><td><strong>Application<\/strong><\/td><td>Distribution warehouse, storage shed, e-commerce fulfilment centre, spare-parts store<\/td><\/tr><\/tbody><\/table>","spec_table_source":{"label":"Specifications","type":"wysiwyg","formatted_value":"<table>\n<tbody>\n<tr>\n<td><strong>Span<\/strong><\/td>\n<td>18 \u2013 48 m clear span (multi-span up to 120 m)<\/td>\n<\/tr>\n<tr>\n<td><strong>Eave Height<\/strong><\/td>\n<td>6 \u2013 12 m, extendable<\/td>\n<\/tr>\n<tr>\n<td><strong>Structure<\/strong><\/td>\n<td>portal-frame<\/td>\n<\/tr>\n<tr>\n<td><strong>Main Material<\/strong><\/td>\n<td>Q355B built-up H sections, hot-rolled columns, Q235B secondary members<\/td>\n<\/tr>\n<tr>\n<td><strong>Application<\/strong><\/td>\n<td>Distribution warehouse, storage shed, e-commerce fulfilment centre, spare-parts store<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n"},"faq_content":"<h3>What clear span can a pre-engineered steel warehouse have?<\/h3>\n<p>Clear spans start at 18 m and go up to 48 m. The frames are tapered built-up H sections that follow the bending moment diagram of each member, so the clear span stays wide while steel weight stays low.<\/p>\n<h3>How much steel does a portal frame warehouse use?<\/h3>\n<p>A typical portal frame warehouse at 4 to 8 m eave height uses roughly 30 to 40 kg\/m2 of floor area, and 40 to 50 kg\/m2 at 10 to 13 m eave height.<\/p>\n<h3>What is the warehouse built from, and where is it fabricated?<\/h3>\n<p>Tapered built-up H-section frames, cold-formed purlins and metal cladding. All of it is cut, welded, drilled and painted in our factory before shipment.<\/p>\n<h3>Is the design adapted to how we will use the building?<\/h3>\n<p>Yes. Each warehouse is designed around the loads of the site and the way the building will be used: racking layout, forklift traffic, fire sprinkler clearance, future PV on the roof and expansion at either gable end.<\/p>","faq_content_source":{"label":"FAQ","type":"wysiwyg","formatted_value":"<h3>What clear span can a pre-engineered steel warehouse have?<\/h3>\n<p>Clear spans start at 18 m and go up to 48 m. The frames are tapered built-up H sections that follow the bending moment diagram of each member, so the clear span stays wide while steel weight stays low.<\/p>\n<h3>How much steel does a portal frame warehouse use?<\/h3>\n<p>A typical portal frame warehouse at 4 to 8 m eave height uses roughly 30 to 40 kg\/m2 of floor area, and 40 to 50 kg\/m2 at 10 to 13 m eave height.<\/p>\n<h3>What is the warehouse built from, and where is it fabricated?<\/h3>\n<p>Tapered built-up H-section frames, cold-formed purlins and metal cladding. All of it is cut, welded, drilled and painted in our factory before shipment.<\/p>\n<h3>Is the design adapted to how we will use the building?<\/h3>\n<p>Yes. Each warehouse is designed around the loads of the site and the way the building will be used: racking layout, forklift traffic, fire sprinkler clearance, future PV on the roof and expansion at either gable end.<\/p>\n"}},"_links":{"self":[{"href":"https:\/\/www.ggsteelstruct.com\/es\/wp-json\/wp\/v2\/product\/8156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ggsteelstruct.com\/es\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/www.ggsteelstruct.com\/es\/wp-json\/wp\/v2\/types\/product"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/es\/wp-json\/wp\/v2\/media\/6412"},{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/es\/wp-json\/wp\/v2\/media\/6390"},{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/es\/wp-json\/wp\/v2\/media\/6409"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/es\/wp-json\/wp\/v2\/media\/6392"}],"wp:attachment":[{"href":"https:\/\/www.ggsteelstruct.com\/es\/wp-json\/wp\/v2\/media?parent=8156"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/es\/wp-json\/wp\/v2\/product_cat?post=8156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}