{"id":8156,"date":"2026-11-11T09:53:27","date_gmt":"2026-11-11T09:53:27","guid":{"rendered":"https:\/\/www.ggsteelstruct.com\/?post_type=product&#038;p=8156"},"modified":"2026-11-20T04:02:14","modified_gmt":"2026-11-20T04:02:14","slug":"pre-engineered-steel-warehouse","status":"publish","type":"product","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/pre-engineered-steel-warehouse\/","title":{"rendered":"Gudang Baja Pra-Rancang"},"content":{"rendered":"<p>Gudang baja pra-rancang dibangun dari rangka bagian H susun meruncing, kuda-kuda berlapis dingin dan pelapis logam, semuanya dipotong, dilas, dibor, dan dicat di pabrik kami sebelum pengiriman. Karena rangka mengikuti diagram momen lentur tiap anggota, berat baja tetap rendah sementara bentang bebas tetap lebar \u2014 gudang rangka portal khas dengan tinggi talang 4\u20138 m menggunakan sekitar 30\u201340 kg\/m\u00b2 luas lantai, dan 40\u201350 kg\/m\u00b2 pada 10\u201313 m.<\/p>\n<p>Setiap gudang dirancang berdasarkan beban dari lokasi dan cara bangunan akan benar-benar digunakan: tata letak rak, lalu lintas forklift, jarak sprinkler api, potensi PV masa depan di atap dan perluasan di ujung gable manapun.<\/p>\n<h2>Spesifikasi Kunci<\/h2>\n<table>\n<tbody>\n<tr>\n<td><strong>Bentang bebas<\/strong><\/td>\n<td>Bentang tunggal 18 \u2013 48 m; tata letak multi-bentang hingga lebar 120 m<\/td>\n<\/tr>\n<tr>\n<td><strong>Tinggi atap<\/strong><\/td>\n<td>Standar 6 \u2013 12 m; minimum 4 m untuk toko kecil<\/td>\n<\/tr>\n<tr>\n<td><strong>Kemiringan atap<\/strong><\/td>\n<td>5% \u2013 10% (1:20 hingga 1:10)<\/td>\n<\/tr>\n<tr>\n<td><strong>Rangka<\/strong><\/td>\n<td>Rangka portal bagian H las meruncing, kolom rol panas bila diperlukan<\/td>\n<\/tr>\n<tr>\n<td><strong>Anggota sekunder<\/strong><\/td>\n<td>Kuda-kuda dan girts dinding C\/Z berlapis dingin, pra-galvanis Z275<\/td>\n<\/tr>\n<tr>\n<td><strong>Pelapis<\/strong><\/td>\n<td>Lembaran baja warna 0,4 \u2013 0,6 mm, panel sandwich 50 \u2013 100 mm, atau panel ALC<\/td>\n<\/tr>\n<tr>\n<td><strong>Jenis baja<\/strong><\/td>\n<td>Rangka utama Q355B, sekunder Q235B; S355JR \/ A572 Gr.50 atas permintaan<\/td>\n<\/tr>\n<tr>\n<td><strong>Kode desain<\/strong><\/td>\n<td>GB 50017 \/ GB 51022, AISC \/ ASCE 7, Eurocode 3, AS\/NZS 4600<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Input desain yang kami butuhkan dari Anda<\/h2>\n<p>Penggunaan bangunan dan tata letak rak atau mezzanine, lokasi situs dan kecepatan angin desain, beban salju dan kategori gempa, dimensi denah (panjang \u00d7 lebar), tinggi talang dan kemiringan atap, ukuran pintu dan jendela, kapasitas crane jika ada, dan jenis pelapis yang Anda pilih. Sketsa tangan dengan dimensi sudah cukup untuk mulai.<\/p>\n<h2>Detail yang menentukan biaya<\/h2>\n<ul>\n<li>Tinggi talang adalah faktor terbesar: rangka pada 10\u201313 m membawa sekitar 20% lebih banyak baja dibanding bentang sama pada 4\u20138 m.<\/li>\n<li>Bentang bebas versus kolom internal \u2014 bentang bebas 36 m membutuhkan lebih banyak baja dibanding dua bentang 18 m dengan kolom tengah, tapi menjaga lantai bebas untuk rak.<\/li>\n<li>Jarak kolom 6\u20138 m cocok untuk sebagian besar gudang; bentang lebih lebar mengurangi jumlah rangka tapi membutuhkan kuda-kuda dan balok crane yang lebih berat.<\/li>\n<li>Jarak sprinkler: NFPA 13 umumnya mengharuskan setidaknya 457 mm (18 in) antara atas penyimpanan dan deflektor sprinkler, dan 914 mm (36 in) untuk beberapa kepala tipe penyimpanan seperti ESFR \u2014 konfirmasi dengan sertifikasi kepala yang Anda gunakan.<\/li>\n<li>PV atap menambah beban permanen sekitar 15\u201325 kg\/m\u00b2 untuk modul plus pemasangan, dan lebih untuk sistem berbobot.<\/li>\n<\/ul>\n<h2>Pengiriman dan pemasangan<\/h2>\n<p>Rangka utama dikirim dalam kontainer open-top atau flat-rack 40 ft, anggota sekunder dan panel dibundel dan setiap bagian membawa nomor tanda sesuai gambar pemasangan. Fabrikasi standar 25\u201335 hari setelah persetujuan gambar. Pekerjaan lapangan dipasang dengan baut, sehingga tim 8\u201312 orang biasanya dapat memasang 1.000\u20131.500 m\u00b2 per minggu setelah fondasi dan baut jangkar siap.<\/p>","protected":false},"excerpt":{"rendered":"<p>Gudang baja prefabrikasi pabrik untuk penyimpanan, distribusi, dan manufaktur ringan. Kami merancang, memproduksi, dan mengirimkan seluruh paket bangunan, sehingga tim Anda hanya perlu merakitnya menggunakan baut di lokasi proyek.<\/p>","protected":false},"featured_media":6392,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_aseo_title":"Pre-Engineered Steel Warehouse Building | GG Steel","_aseo_desc":"Factory-built steel warehouses for storage, distribution and light manufacturing. Tapered frames, purlins and cladding shipped as a bolt-together kit.","_aseo_noindex":false,"_aseo_og_image":0,"_aseo_schema_type":""},"product_cat":[48,36],"class_list":["post-8156","product","type-product","status-publish","has-post-thumbnail","hentry","product_cat-hot-sales","product_cat-steel-warehouse"],"acf":{"gallery":[6409,6390,6412],"gallery_source":{"label":"Gallery","type":"gallery","formatted_value":[{"ID":6409,"id":6409,"title":"warehouse-construction","filename":"warehouse-construction.webp","filesize":140916,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction.webp","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/pre-engineered-steel-warehouse\/warehouse-construction\/","alt":"warehouse construction","author":"1","description":"","caption":"","name":"warehouse-construction","status":"inherit","uploaded_to":8156,"date":"2026-11-01 18:14:36","modified":"2026-11-11 09:52:37","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":1021,"height":575,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction-300x169.webp","medium-width":300,"medium-height":169,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction-768x433.webp","medium_large-width":768,"medium_large-height":433,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction.webp","large-width":1021,"large-height":575,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction.webp","1536x1536-width":1021,"1536x1536-height":575,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction.webp","2048x2048-width":1021,"2048x2048-height":575,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/warehouse-construction-18x10.webp","trp-custom-language-flag-width":18,"trp-custom-language-flag-height":10}},{"ID":6390,"id":6390,"title":"completed-industrial-building-460","filename":"completed-industrial-building-460.webp","filesize":105234,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460.webp","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/pre-engineered-steel-warehouse\/completed-industrial-building-460\/","alt":"completed industrial building 460","author":"1","description":"","caption":"","name":"completed-industrial-building-460","status":"inherit","uploaded_to":8156,"date":"2026-11-01 18:14:20","modified":"2026-11-11 09:52:37","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":1200,"height":1200,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-300x300.webp","medium-width":300,"medium-height":300,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-768x768.webp","medium_large-width":768,"medium_large-height":768,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-1024x1024.webp","large-width":1024,"large-height":1024,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460.webp","1536x1536-width":1200,"1536x1536-height":1200,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460.webp","2048x2048-width":1200,"2048x2048-height":1200,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-460-12x12.webp","trp-custom-language-flag-width":12,"trp-custom-language-flag-height":12}},{"ID":6412,"id":6412,"title":"industrial-steel-frame-326","filename":"industrial-steel-frame-326.webp","filesize":199928,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326.webp","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/pre-engineered-steel-warehouse\/industrial-steel-frame-326\/","alt":"industrial steel frame 326","author":"1","description":"","caption":"","name":"industrial-steel-frame-326","status":"inherit","uploaded_to":8156,"date":"2026-11-01 18:14:38","modified":"2026-11-11 09:52:37","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":944,"height":709,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326-300x225.webp","medium-width":300,"medium-height":225,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326-768x577.webp","medium_large-width":768,"medium_large-height":577,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326.webp","large-width":944,"large-height":709,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326.webp","1536x1536-width":944,"1536x1536-height":709,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326.webp","2048x2048-width":944,"2048x2048-height":709,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/industrial-steel-frame-326-16x12.webp","trp-custom-language-flag-width":16,"trp-custom-language-flag-height":12}}]},"downloads":[{"title":"Guiguan Steel Structure Brochure 2024","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-steel-brochure-2024.pdf"},{"title":"Profil Perusahaan Struktur Baja Guiguan","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-company-profile.pdf"}],"downloads_source":{"label":"Downloads","type":"repeater","formatted_value":[{"title":"Guiguan Steel Structure Brochure 2024","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-steel-brochure-2024.pdf"},{"title":"Profil Perusahaan Struktur Baja Guiguan","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-company-profile.pdf"}]},"spec_table":"<table><tbody><tr><td><strong>Span<\/strong><\/td><td>18 \u2013 48 m clear span (multi-span up to 120 m)<\/td><\/tr><tr><td><strong>Eave Height<\/strong><\/td><td>6 \u2013 12 m, extendable<\/td><\/tr><tr><td><strong>Structure<\/strong><\/td><td>portal-frame<\/td><\/tr><tr><td><strong>Main Material<\/strong><\/td><td>Q355B built-up H sections, hot-rolled columns, Q235B secondary members<\/td><\/tr><tr><td><strong>Application<\/strong><\/td><td>Distribution warehouse, storage shed, e-commerce fulfilment centre, spare-parts store<\/td><\/tr><\/tbody><\/table>","spec_table_source":{"label":"Specifications","type":"wysiwyg","formatted_value":"<table>\n<tbody>\n<tr>\n<td><strong>Span<\/strong><\/td>\n<td>18 \u2013 48 m clear span (multi-span up to 120 m)<\/td>\n<\/tr>\n<tr>\n<td><strong>Eave Height<\/strong><\/td>\n<td>6 \u2013 12 m, extendable<\/td>\n<\/tr>\n<tr>\n<td><strong>Structure<\/strong><\/td>\n<td>portal-frame<\/td>\n<\/tr>\n<tr>\n<td><strong>Main Material<\/strong><\/td>\n<td>Q355B built-up H sections, hot-rolled columns, Q235B secondary members<\/td>\n<\/tr>\n<tr>\n<td><strong>Application<\/strong><\/td>\n<td>Distribution warehouse, storage shed, e-commerce fulfilment centre, spare-parts store<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n"},"faq_content":"<h3>What clear span can a pre-engineered steel warehouse have?<\/h3>\n<p>Clear spans start at 18 m and go up to 48 m. The frames are tapered built-up H sections that follow the bending moment diagram of each member, so the clear span stays wide while steel weight stays low.<\/p>\n<h3>How much steel does a portal frame warehouse use?<\/h3>\n<p>A typical portal frame warehouse at 4 to 8 m eave height uses roughly 30 to 40 kg\/m2 of floor area, and 40 to 50 kg\/m2 at 10 to 13 m eave height.<\/p>\n<h3>What is the warehouse built from, and where is it fabricated?<\/h3>\n<p>Tapered built-up H-section frames, cold-formed purlins and metal cladding. All of it is cut, welded, drilled and painted in our factory before shipment.<\/p>\n<h3>Is the design adapted to how we will use the building?<\/h3>\n<p>Yes. Each warehouse is designed around the loads of the site and the way the building will be used: racking layout, forklift traffic, fire sprinkler clearance, future PV on the roof and expansion at either gable end.<\/p>","faq_content_source":{"label":"FAQ","type":"wysiwyg","formatted_value":"<h3>What clear span can a pre-engineered steel warehouse have?<\/h3>\n<p>Clear spans start at 18 m and go up to 48 m. The frames are tapered built-up H sections that follow the bending moment diagram of each member, so the clear span stays wide while steel weight stays low.<\/p>\n<h3>How much steel does a portal frame warehouse use?<\/h3>\n<p>A typical portal frame warehouse at 4 to 8 m eave height uses roughly 30 to 40 kg\/m2 of floor area, and 40 to 50 kg\/m2 at 10 to 13 m eave height.<\/p>\n<h3>What is the warehouse built from, and where is it fabricated?<\/h3>\n<p>Tapered built-up H-section frames, cold-formed purlins and metal cladding. All of it is cut, welded, drilled and painted in our factory before shipment.<\/p>\n<h3>Is the design adapted to how we will use the building?<\/h3>\n<p>Yes. Each warehouse is designed around the loads of the site and the way the building will be used: racking layout, forklift traffic, fire sprinkler clearance, future PV on the roof and expansion at either gable end.<\/p>\n"}},"_links":{"self":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/product\/8156","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/types\/product"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6412"},{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6390"},{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6409"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6392"}],"wp:attachment":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media?parent=8156"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/product_cat?post=8156"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}