{"id":8159,"date":"2026-11-11T09:53:33","date_gmt":"2026-11-11T09:53:33","guid":{"rendered":"https:\/\/www.ggsteelstruct.com\/?post_type=product&#038;p=8159"},"modified":"2026-11-20T04:02:20","modified_gmt":"2026-11-20T04:02:20","slug":"logistics-distribution-center","status":"publish","type":"product","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/logistics-distribution-center\/","title":{"rendered":"Pusat Distribusi Logistik"},"content":{"rendered":"<p>Pusat distribusi adalah bangunan rendah dengan jejak besar di mana biaya bingkai didominasi oleh pengulangan dan bagaimana dermaga, blok kantor, dan mezzanine terintegrasi. Bangunan 200 m \u00d7 120 m dengan grid kolom 6 m adalah masalah desain yang berbeda dari gudang tunggal 30 m.<\/p>\n<p>Kami merancang bingkai sebagai keluarga dari bay yang diulang sehingga peralatan fabrikasi, transportasi, dan pemasangan berjalan dalam ritme yang sama, dan kami mempertahankan struktur atap seragam sehingga rel PV dan pipa sprinkler dapat dipasang tanpa penyangga khusus.<\/p>\n<h2>Spesifikasi Kunci<\/h2>\n<table>\n<tbody>\n<tr>\n<td><strong>Jejak<\/strong><\/td>\n<td>Tipikal 80 m \u00d7 180 m hingga 120 m \u00d7 250 m<\/td>\n<\/tr>\n<tr>\n<td><strong>Grid<\/strong><\/td>\n<td>Jarak kolom 6 m, 7,5 m, atau 9 m; bentang 24 \u2013 45 m<\/td>\n<\/tr>\n<tr>\n<td><strong>Tinggi atap<\/strong><\/td>\n<td>9 \u2013 13 m untuk menyesuaikan rak dan pintu dermaga<\/td>\n<\/tr>\n<tr>\n<td><strong>Dermaga<\/strong><\/td>\n<td>Pengatur dermaga dan shelter di satu atau kedua sisi panjang, ramp sesuai kebutuhan<\/td>\n<\/tr>\n<tr>\n<td><strong>Mezzanine<\/strong><\/td>\n<td>Lantai komposit atau mezzanine baja untuk kantor, jarak lantai ke lantai 4,5 \u2013 6 m<\/td>\n<\/tr>\n<tr>\n<td><strong>Atap<\/strong><\/td>\n<td>Standing seam atau sheet trapezoid dengan insulasi 100 mm; jarak purlin siap PV<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Aturan tata letak yang menghemat biaya<\/h2>\n<ul>\n<li>Ulangi satu tipe bay sejauh mungkin: bingkai identik berarti jig identik, kesalahan gambar lebih sedikit dan pemasangan lebih cepat.<\/li>\n<li>Tempatkan blok kantor di sudut atau ujung atap sehingga tidak mengganggu grid gudang.<\/li>\n<li>Pertahankan kanopi dermaga sebagai struktur ringan terpisah daripada memperpanjang bingkai utama.<\/li>\n<li>Sediakan bay ekspansi di satu ujung atap dengan sambungan dinding ujung berbaut sehingga perpanjangan di masa depan tidak mengganggu atap.<\/li>\n<\/ul>\n<h2>Api, asap, dan akses<\/h2>\n<p>Pipa utama sprinkler berjalan sepanjang garis purlin, ventilasi asap dirancang bersama insinyur kebakaran, dan setiap dinding sekat yang melintasi bangunan dirinci dengan sambungan pergerakan sehingga bingkai dapat membengkok tanpa meretakkan dinding.<\/p>\n<h2>Jadwal<\/h2>\n<p>Urutan tipikal: 24 jam skema awal dan anggaran, 5\u20137 hari untuk gambar struktur setelah survei, 25\u201340 hari fabrikasi, kemudian pengiriman dalam batch sesuai rencana pemasangan di lokasi. Pondasi dan baut jangkar dibangun paralel dengan fabrikasi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Pusat distribusi baja berskala besar untuk kebutuhan 3PL, e-commerce, dan logistik regional. Kami merencanakan tata letak grid, area bongkar muat, dan atap bersama operator Anda agar bangunan dapat berkembang seiring peningkatan volume operasional.<\/p>","protected":false},"featured_media":6412,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_aseo_title":"Steel Logistics Distribution Center | GG Steel","_aseo_desc":"Large steel distribution centres for 3PL and e-commerce, with grid, docks, office block and mezzanine planned with your operator for future growth.","_aseo_noindex":false,"_aseo_og_image":0,"_aseo_schema_type":""},"product_cat":[37,36],"class_list":["post-8159","product","type-product","status-publish","has-post-thumbnail","hentry","product_cat-logistics-warehouse","product_cat-steel-warehouse"],"acf":{"gallery":[6406,6485],"gallery_source":{"label":"Gallery","type":"gallery","formatted_value":[{"ID":6406,"id":6406,"title":"completed-industrial-building-459","filename":"completed-industrial-building-459.webp","filesize":138294,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-459.webp","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/logistics-distribution-center\/completed-industrial-building-459\/","alt":"completed industrial building 459","author":"1","description":"","caption":"","name":"completed-industrial-building-459","status":"inherit","uploaded_to":8159,"date":"2026-11-01 18:14:33","modified":"2026-11-11 09:52:42","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":1600,"height":1200,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-459-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-459-300x225.webp","medium-width":300,"medium-height":225,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-459-768x576.webp","medium_large-width":768,"medium_large-height":576,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-459-1024x768.webp","large-width":1024,"large-height":768,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-459-1536x1152.webp","1536x1536-width":1536,"1536x1536-height":1152,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-459.webp","2048x2048-width":1600,"2048x2048-height":1200,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-industrial-building-459-16x12.webp","trp-custom-language-flag-width":16,"trp-custom-language-flag-height":12}},{"ID":6485,"id":6485,"title":"steel-component-delivery-235","filename":"steel-component-delivery-235.webp","filesize":172396,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/steel-component-delivery-235.webp","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/logistics-distribution-center\/steel-component-delivery-235\/","alt":"","author":"1","description":"","caption":"","name":"steel-component-delivery-235","status":"inherit","uploaded_to":8159,"date":"2026-11-01 18:15:43","modified":"2026-11-11 09:52:42","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":1600,"height":1200,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/steel-component-delivery-235-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/steel-component-delivery-235-300x225.webp","medium-width":300,"medium-height":225,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/steel-component-delivery-235-768x576.webp","medium_large-width":768,"medium_large-height":576,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/steel-component-delivery-235-1024x768.webp","large-width":1024,"large-height":768,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/steel-component-delivery-235-1536x1152.webp","1536x1536-width":1536,"1536x1536-height":1152,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/steel-component-delivery-235.webp","2048x2048-width":1600,"2048x2048-height":1200,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/steel-component-delivery-235-16x12.webp","trp-custom-language-flag-width":16,"trp-custom-language-flag-height":12}}]},"downloads":[{"title":"Guiguan Steel Structure Brochure 2024","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-steel-brochure-2024.pdf"},{"title":"Profil Perusahaan Struktur Baja Guiguan","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-company-profile.pdf"}],"downloads_source":{"label":"Downloads","type":"repeater","formatted_value":[{"title":"Guiguan Steel Structure Brochure 2024","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-steel-brochure-2024.pdf"},{"title":"Profil Perusahaan Struktur Baja Guiguan","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-company-profile.pdf"}]},"spec_table":"<table><tbody><tr><td><strong>Span<\/strong><\/td><td>24 \u2013 45 m multi-span, 120 m wide and above<\/td><\/tr><tr><td><strong>Eave Height<\/strong><\/td><td>9 \u2013 13 m<\/td><\/tr><tr><td><strong>Structure<\/strong><\/td><td>portal-frame<\/td><\/tr><tr><td><strong>Main Material<\/strong><\/td><td>Q355B welded H frames, hot-rolled columns, Z275 purlins<\/td><\/tr><tr><td><strong>Application<\/strong><\/td><td>Third-party logistics hub, e-commerce fulfilment, regional distribution centre<\/td><\/tr><\/tbody><\/table>","spec_table_source":{"label":"Specifications","type":"wysiwyg","formatted_value":"<table>\n<tbody>\n<tr>\n<td><strong>Span<\/strong><\/td>\n<td>24 \u2013 45 m multi-span, 120 m wide and above<\/td>\n<\/tr>\n<tr>\n<td><strong>Eave Height<\/strong><\/td>\n<td>9 \u2013 13 m<\/td>\n<\/tr>\n<tr>\n<td><strong>Structure<\/strong><\/td>\n<td>portal-frame<\/td>\n<\/tr>\n<tr>\n<td><strong>Main Material<\/strong><\/td>\n<td>Q355B welded H frames, hot-rolled columns, Z275 purlins<\/td>\n<\/tr>\n<tr>\n<td><strong>Application<\/strong><\/td>\n<td>Third-party logistics hub, e-commerce fulfilment, regional distribution centre<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n"},"faq_content":"<h3>What size is a typical logistics distribution center steel building?<\/h3>\n<p>Typical footprints run from 80 m x 180 m up to 120 m x 250 m. Column grids are 6 m, 7.5 m or 9 m, with spans of 24 to 45 m and eave heights of 9 to 13 m to suit racking and dock doors.<\/p>\n<h3>How are the docks and the office mezzanine integrated into the frame?<\/h3>\n<p>Dock levellers and shelters sit on one or both long sides, with ramps where required. The dock canopy is built as a separate light structure so it does not load the main frame. The office block goes at a corner or gable end so it does not interrupt the warehouse grid, and the mezzanine uses composite floor deck or a steel mezzanine at 4.5 to 6 m floor-to-floor.<\/p>\n<h3>Can the building be extended later?<\/h3>\n<p>Yes. We reserve expansion bays at one gable end with bolted end-wall connections, so a future extension can be added without disturbing the existing roof.<\/p>\n<h3>Is the roof ready for solar PV and sprinklers?<\/h3>\n<p>Yes. The roof structure is kept uniform with PV-ready purlin spacing, so PV rails can be installed without special supports. Sprinkler mains run along the purlin line, and the roof is standing seam or trapezoidal sheet with 100 mm insulation.<\/p>\n<h3>How long does a distribution center project take?<\/h3>\n<p>A preliminary scheme and budget takes about 24 hours. Structural drawings take 5 to 7 days after survey, and fabrication takes 25 to 40 days. Shipment is in batches matched to your erection plan, and foundations and anchor bolts are built in parallel with fabrication.<\/p>","faq_content_source":{"label":"FAQ","type":"wysiwyg","formatted_value":"<h3>What size is a typical logistics distribution center steel building?<\/h3>\n<p>Typical footprints run from 80 m x 180 m up to 120 m x 250 m. Column grids are 6 m, 7.5 m or 9 m, with spans of 24 to 45 m and eave heights of 9 to 13 m to suit racking and dock doors.<\/p>\n<h3>How are the docks and the office mezzanine integrated into the frame?<\/h3>\n<p>Dock levellers and shelters sit on one or both long sides, with ramps where required. The dock canopy is built as a separate light structure so it does not load the main frame. The office block goes at a corner or gable end so it does not interrupt the warehouse grid, and the mezzanine uses composite floor deck or a steel mezzanine at 4.5 to 6 m floor-to-floor.<\/p>\n<h3>Can the building be extended later?<\/h3>\n<p>Yes. We reserve expansion bays at one gable end with bolted end-wall connections, so a future extension can be added without disturbing the existing roof.<\/p>\n<h3>Is the roof ready for solar PV and sprinklers?<\/h3>\n<p>Yes. The roof structure is kept uniform with PV-ready purlin spacing, so PV rails can be installed without special supports. Sprinkler mains run along the purlin line, and the roof is standing seam or trapezoidal sheet with 100 mm insulation.<\/p>\n<h3>How long does a distribution center project take?<\/h3>\n<p>A preliminary scheme and budget takes about 24 hours. Structural drawings take 5 to 7 days after survey, and fabrication takes 25 to 40 days. Shipment is in batches matched to your erection plan, and foundations and anchor bolts are built in parallel with fabrication.<\/p>\n"}},"_links":{"self":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/product\/8159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/types\/product"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6485"},{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6412"}],"wp:attachment":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media?parent=8159"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/product_cat?post=8159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}