{"id":8162,"date":"2026-11-11T09:53:39","date_gmt":"2026-11-11T09:53:39","guid":{"rendered":"https:\/\/www.ggsteelstruct.com\/?post_type=product&#038;p=8162"},"modified":"2026-11-20T04:02:26","modified_gmt":"2026-11-20T04:02:26","slug":"steel-exhibition-hall","status":"publish","type":"product","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/steel-exhibition-hall\/","title":{"rendered":"Balai Pameran Baja &amp; Pusat Konvensi"},"content":{"rendered":"<p>Balai pameran dan arena adalah bangunan bentang panjang dengan beban gantung berat: grid rigging, truss pencahayaan, layar dan signage. Struktur atap harus dirancang untuk beban tersebut sejak awal, dan sistem node harus memungkinkan pemasangan tanpa pengelasan di lokasi.<\/p>\n<p>Kami memproduksi space frame bola yang dibaut dan bola berlubang yang dilas sesuai JG\/T 10 dan JG\/T 11, dengan anggota tabung yang dipotong dan dilas sesuai geometri yang dibutuhkan.<\/p>\n<h2>Spesifikasi Kunci<\/h2>\n<table>\n<tbody>\n<tr>\n<td><strong>Rentang<\/strong><\/td>\n<td>60 \u2013 120 m tanpa kolom<\/td>\n<\/tr>\n<tr>\n<td><strong>Kedalaman grid<\/strong><\/td>\n<td>1,5 \u2013 3,5 m, ditentukan oleh bentang dan beban<\/td>\n<\/tr>\n<tr>\n<td><strong>Jenis simpul<\/strong><\/td>\n<td>Node bola yang dibaut (JG\/T 10), bola berlubang yang dilas (JG\/T 11), node baja cor (GB 7659)<\/td>\n<\/tr>\n<tr>\n<td><strong>Beban gantung<\/strong><\/td>\n<td>Grid rigging dirancang untuk 50 \u2013 150 kg per titik, disepakati dengan operator tempat<\/td>\n<\/tr>\n<tr>\n<td><strong>Defleksi<\/strong><\/td>\n<td>Defleksi terukur setelah pemasangan tidak boleh melebihi 1,15 \u00d7 nilai perhitungan (JGJ 7-2010 \u00a76.11.3)<\/td>\n<\/tr>\n<tr>\n<td><strong>Atap<\/strong><\/td>\n<td>Aluminium atau baja standing seam pada purlin, dengan pelapis akustik bila diperlukan<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Pemeriksaan kualitas space frame<\/h2>\n<ul>\n<li>Pengencangan baut: setiap sambungan bola yang dibaut diketatkan sesuai nilai spesifikasi dan diberi tanda, dengan sampel diperiksa menggunakan kunci torsi setelah pemasangan.<\/li>\n<li>Ketebalan dinding anggota: dinding tabung diperiksa sebelum dipotong; tabung berukuran kurang adalah substitusi paling umum di pasar ini.<\/li>\n<li>Geometri: rangka dirakit terlebih dahulu di bengkel dalam modul di mana transportasi memungkinkan, sehingga kesesuaian di lokasi dikonfirmasi sebelum pengiriman.<\/li>\n<li>Pengangkatan: untuk pengangkatan integral, perbedaan tingkat antara titik angkat berdekatan tidak boleh melebihi 1\/400 dari jarak mereka dan 15 mm (dongkrak) atau 1\/250 dan 25 mm (dongkrak strand), sesuai JGJ 7-2010 \u00a76.7.3.<\/li>\n<\/ul>\n<h2>Integrasi layanan<\/h2>\n<p>Saluran HVAC, pipa sprinkler utama, grid pencahayaan dan panel akustik semuanya digantung dari space frame. Kami menyediakan tabel beban dan detail pemasangan sehingga kontraktor MEP dapat merancang tanpa mengebor anggota acak di lokasi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Struktur baja bentang panjang untuk gedung pameran, pusat konvensi, dan venue olahraga. Kami merancang dan memproduksi atap tanpa kolom yang menjaga area lantai tetap terbuka untuk berbagai tata letak acara.<\/p>","protected":false},"featured_media":6435,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_aseo_title":"Steel Exhibition Hall & Convention Centre | GG Steel","_aseo_desc":"Long-span steel structures for exhibition halls, convention centres and sports venues, with column-free roofs designed for rigging and lighting loads.","_aseo_noindex":false,"_aseo_og_image":0,"_aseo_schema_type":""},"product_cat":[40,41],"class_list":["post-8162","product","type-product","status-publish","has-post-thumbnail","hentry","product_cat-commercial-building","product_cat-exhibition-hall"],"acf":{"gallery":[6383,6413],"gallery_source":{"label":"Gallery","type":"gallery","formatted_value":[{"ID":6383,"id":6383,"title":"stadion","filename":"stadium.webp","filesize":77840,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/stadium.webp","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/steel-exhibition-hall\/stadium\/","alt":"stadium","author":"1","description":"","caption":"","name":"stadion","status":"inherit","uploaded_to":8162,"date":"2026-11-01 18:14:14","modified":"2026-11-11 09:52:47","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":1200,"height":442,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/stadium-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/stadium-300x111.webp","medium-width":300,"medium-height":111,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/stadium-768x283.webp","medium_large-width":768,"medium_large-height":283,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/stadium-1024x377.webp","large-width":1024,"large-height":377,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/stadium.webp","1536x1536-width":1200,"1536x1536-height":442,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/stadium.webp","2048x2048-width":1200,"2048x2048-height":442,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/stadium-18x7.webp","trp-custom-language-flag-width":18,"trp-custom-language-flag-height":7}},{"ID":6413,"id":6413,"title":"completed-dome-building-368","filename":"completed-dome-building-368.webp","filesize":129878,"url":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-dome-building-368.webp","link":"https:\/\/www.ggsteelstruct.com\/id\/products\/steel-exhibition-hall\/completed-dome-building-368\/","alt":"completed dome building 368","author":"1","description":"","caption":"","name":"completed-dome-building-368","status":"inherit","uploaded_to":8162,"date":"2026-11-01 18:14:40","modified":"2026-11-11 09:52:47","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/www.ggsteelstruct.com\/wp-includes\/images\/media\/default.png","width":1200,"height":1200,"sizes":{"thumbnail":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-dome-building-368-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-dome-building-368-300x300.webp","medium-width":300,"medium-height":300,"medium_large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-dome-building-368-768x768.webp","medium_large-width":768,"medium_large-height":768,"large":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-dome-building-368-1024x1024.webp","large-width":1024,"large-height":1024,"1536x1536":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-dome-building-368.webp","1536x1536-width":1200,"1536x1536-height":1200,"2048x2048":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-dome-building-368.webp","2048x2048-width":1200,"2048x2048-height":1200,"trp-custom-language-flag":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/completed-dome-building-368-12x12.webp","trp-custom-language-flag-width":12,"trp-custom-language-flag-height":12}}]},"downloads":[{"title":"Guiguan Steel Structure Brochure 2024","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-steel-brochure-2024.pdf"},{"title":"Profil Perusahaan Struktur Baja Guiguan","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-company-profile.pdf"}],"downloads_source":{"label":"Downloads","type":"repeater","formatted_value":[{"title":"Guiguan Steel Structure Brochure 2024","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-steel-brochure-2024.pdf"},{"title":"Profil Perusahaan Struktur Baja Guiguan","file":"https:\/\/www.ggsteelstruct.com\/wp-content\/uploads\/2026\/11\/guiguan-company-profile.pdf"}]},"spec_table":"<table><tbody><tr><td><strong>Span<\/strong><\/td><td>60 \u2013 120 m<\/td><\/tr><tr><td><strong>Eave Height<\/strong><\/td><td>15 \u2013 30 m<\/td><\/tr><tr><td><strong>Structure<\/strong><\/td><td>space-frame<\/td><\/tr><tr><td><strong>Main Material<\/strong><\/td><td>Q355B space frame tubes, bolted sphere nodes to JG\/T 10<\/td><\/tr><tr><td><strong>Application<\/strong><\/td><td>Exhibition centre, convention hall, sports hall, arena<\/td><\/tr><\/tbody><\/table>","spec_table_source":{"label":"Specifications","type":"wysiwyg","formatted_value":"<table>\n<tbody>\n<tr>\n<td><strong>Span<\/strong><\/td>\n<td>60 \u2013 120 m<\/td>\n<\/tr>\n<tr>\n<td><strong>Eave Height<\/strong><\/td>\n<td>15 \u2013 30 m<\/td>\n<\/tr>\n<tr>\n<td><strong>Structure<\/strong><\/td>\n<td>space-frame<\/td>\n<\/tr>\n<tr>\n<td><strong>Main Material<\/strong><\/td>\n<td>Q355B space frame tubes, bolted sphere nodes to JG\/T 10<\/td>\n<\/tr>\n<tr>\n<td><strong>Application<\/strong><\/td>\n<td>Exhibition centre, convention hall, sports hall, arena<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n"},"faq_content":"<h3>What span can an exhibition hall roof reach?<\/h3>\n<p>Spans are 60 to 120 m column-free. The space frame grid is 1.5 to 3.5 m deep, set by the span and the load.<\/p>\n<h3>Which node systems do you use for the roof?<\/h3>\n<p>Bolted sphere nodes (JG\/T 10), welded hollow sphere nodes (JG\/T 11) and cast steel nodes (GB 7659), with tube members cut and welded to the required geometry.<\/p>\n<h3>Can lighting trusses and screens be hung from the roof?<\/h3>\n<p>Yes. The rigging grid is designed for 50 to 150 kg per point, agreed with the venue operator, and the node system lets loads be attached without site welding.<\/p>\n<h3>Why are hanging loads designed from the start?<\/h3>\n<p>Exhibition halls carry heavy hanging loads such as rigging grids, lighting trusses, screens and signage. The roof structure must be designed for them from the beginning.<\/p>","faq_content_source":{"label":"FAQ","type":"wysiwyg","formatted_value":"<h3>What span can an exhibition hall roof reach?<\/h3>\n<p>Spans are 60 to 120 m column-free. The space frame grid is 1.5 to 3.5 m deep, set by the span and the load.<\/p>\n<h3>Which node systems do you use for the roof?<\/h3>\n<p>Bolted sphere nodes (JG\/T 10), welded hollow sphere nodes (JG\/T 11) and cast steel nodes (GB 7659), with tube members cut and welded to the required geometry.<\/p>\n<h3>Can lighting trusses and screens be hung from the roof?<\/h3>\n<p>Yes. The rigging grid is designed for 50 to 150 kg per point, agreed with the venue operator, and the node system lets loads be attached without site welding.<\/p>\n<h3>Why are hanging loads designed from the start?<\/h3>\n<p>Exhibition halls carry heavy hanging loads such as rigging grids, lighting trusses, screens and signage. The roof structure must be designed for them from the beginning.<\/p>\n"}},"_links":{"self":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/product\/8162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/types\/product"}],"acf:attachment":[{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6413"},{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6383"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media\/6435"}],"wp:attachment":[{"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/media?parent=8162"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/www.ggsteelstruct.com\/id\/wp-json\/wp\/v2\/product_cat?post=8162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}