Home / About / Manufacturing Bases

Company

Eight fabrication bases, one quality system

Bases in Guangdong (Huizhou, Dongguan, Foshan, Shaoguan, Heyuan), Fujian, Guangxi and Jiangxi. Work is placed at the base best equipped for it, and shipped from the nearest port.

8

Bases

300,000 t

Annual capacity

5

In Guangdong

Jiangxi

Digital factory, 2023

Bases

Where each base sits

BaseProvinceMain productsNearest port
HuizhouGuangdongHeavy members, box columnsShenzhen Yantian / Huizhou
DongguanGuangdongHeavy steel, HQ engineeringShenzhen / Humen
FoshanGuangdongPanels, light steelGuangzhou Nansha
ShaoguanGuangdongStructural steelGuangzhou Nansha
HeyuanGuangdongStructural steelShenzhen Yantian
FujianFujianStructural steelXiamen
GuangxiGuangxiStructural steelQinzhou / Fangchenggang
JiangxiJiangxiDigital factory: floor deck, componentsRail to coast

Products per base, floor areas and equipment lists to be confirmed by each base.

How work is placed

Which base builds your project

A group with 8 bases should tell you which one is building your steel. We name it in the contract.

What decides itHow
Member typeHeavy box columns and plate girders go to bases with heavy SAW and ESW lines. Deck, purlins and panels go to the forming plants.
Tonnage and scheduleLarge jobs can be split across two bases under one ITP. Each base marks its pieces so records stay traceable.
PortExport jobs go to a base near the loading port where the equipment allows, to cut inland haulage.
SubcontractingWhether any work is subcontracted, and for what. Any subcontracted item is declared in writing before the contract.
Equipment

Typical equipment across the bases

Cutting

CNC flame and plasma cutting, beam drilling and sawing lines.

Welding

SAW lines for H and box sections, ESW for diaphragms, CO2 robots.

Forming

Roll forming lines for purlins and deck, bending and reinforcement welding lines.

Inspection

UT and MT equipment, total stations, coating gauges.

Auditing a base

What to check, and when

A capability audit before the order and a pre-shipment inspection at the end of fabrication are different checks. One does not replace the other.

CheckWhenWhat the inspector looks at
Capability auditBefore the contractBusiness licence matches the contracting entity; bays, cranes and lines for your member sizes; welder qualifications; the QC team and their equipment; current workload against your schedule.
In-process inspectionDuring fabricationMaterial certificates against heat numbers, fit-up, weld NDT, first-article dimensions. See our ITP.
Pre-shipment inspectionWhen fabrication is 80–100% completeDimensions, coating thickness, marking and packing against the drawings and the packing list.

You may use your own inspector or a third party for any of these. We give access to the bays and records.

Audit the base before you order

On site or by live video. We show the bays, equipment and records for your project.