Ready-to-use modular buildings for site offices, camps, dormitories and clinics. Units leave our factory finished inside and out, so you can move in within days of delivery.
Factory-built modular units, 3–7.5 m wide, stacked up to 3 storeys, delivered complete with wiring, plumbing and finishes and craned into place.

Modular houses are steel-framed boxes built and fitted out in the factory, then shipped as complete units. The building work happens indoors, which is why a modular camp can be occupied weeks before a site-built one, and why quality does not depend on the weather at the site.

Standard units are 3 m wide and 6–7.5 m long, stackable to three storeys, with a galvanized cold-formed steel frame and a sandwich panel envelope. Layouts can combine units into dormitories, offices, canteens and clinics.

Key Specifications

Module size 3 × 6 m, 3 × 7.5 m standard; custom widths to 7.5 m
Storeys Up to 3 stacked with a connecting frame
Frame Galvanized cold-formed steel, 1.2 – 2.0 mm
Envelope 50/75/100 mm EPS, rock wool or PU sandwich panel
Floor 18 mm cement board or plywood on steel joists, PVC or laminate finish
Electrical Wiring, sockets, lights and distribution board pre-installed and tested

What is included in a delivered unit

  • Structure, wall and roof panels, floor, doors and windows, electrical wiring and fixtures, and — where specified — plumbing for a bathroom or kitchenette.
  • Units are lifted by crane with a four-point sling; lifting points and the centre of gravity are marked on each unit.
  • Transport: a 40 ft container carries two standard 3 × 6 m units stacked, or one 3 × 7.5 m unit with its fittings.

Site requirements

A level concrete strip or pad foundation, crane access along the installation line, and a power supply for final connections. A 100-unit camp is typically installed in 2–3 weeks once the foundation is ready.

Where modular is the wrong choice

For a permanent building with a long design life and a large clear span — a factory or a warehouse — a steel frame building is cheaper per square metre. Modular wins for repetitive rooms: dormitories, offices, clinics and site facilities.

Span 3 – 7.5 m module width
Eave Height 2.7 – 3.2 m per storey
Structure other
Main Material Galvanized cold-formed steel frame, 75–100 mm sandwich panel envelope
Application Site office, labour camp, dormitory, canteen, clinic, temporary school

What size are the modular units?

Standard modules are 3 x 6 m and 3 x 7.5 m, with custom widths up to 7.5 m. Units can be stacked up to three storeys with a connecting frame.

What are the modular houses made of?

A galvanized cold-formed steel frame, 1.2 to 2.0 mm, with a sandwich panel envelope.

Why can a modular camp be occupied sooner?

The building work and fit-out happen indoors in the factory, and the units are shipped complete. Quality also does not depend on the weather at the site.

What can the units be combined into?

Layouts can combine units into dormitories, offices, canteens and clinics.