Coating and fire protection, chosen for the site and fixed before fabrication

A coating is specified by two things: how aggressive the site is, and how long it must last before first maintenance. Fire protection is specified by the rating and the section. All three must be fixed before shop drawings, because they change the details.

ISO 12944

Paint system standard

ISO 1461

Galvanizing standard

Sa 2½

Blast cleaning grade

C2–CX

Corrosivity categories

Step 1

How aggressive is the site?

ISO 12944-2 classes atmospheric corrosivity by site. Your engineer or coating consultant sets it; these are typical examples.

Danh mụcCorrosivityTypical exteriorTypical interior
C2ThấpRural, low pollutionUnheated warehouses, possible condensation
C3Trung bìnhUrban, mild industrial, low-salinity coastFood plants, laundries, high humidity
C4CaoIndustrial, coastal with moderate salinityChemical plants, swimming pools
C5Rất caoIndustrial with high humidity, coastal with high salinityConstant condensation, high pollution
CXExtremeOffshore, tropical with very high salinityExtreme humidity, aggressive atmosphere

After ISO 12944-2. Tropical coastal sites in Southeast Asia are often C4 or C5.

Step 2

How long must it last before first major maintenance?

L

Thấp

Up to 7 years

M

Trung bình

7–15 years

H

Cao

15–25 years

VH

Rất cao

More than 25 years

Durability ranges per ISO 12944-1:2017. Durability is not a guarantee period; warranties are agreed separately.

Step 3

Paint, galvanizing or both?

Paint systemMạ kẽm nhúng nóngDuplex (galvanizing + paint)
Phù hợp nhất choLarge members, colour required, C2–C4Secondary steel, C3–C5, low maintenanceC5–CX, long life, colour required
Size limitKhông cóKettle sizeKettle size
Damage toleranceLow; coating scratches to steelHigh; zinc protects small damageCao
Design changes neededEdges and welds dressedVent and drain holes, symmetric detailsBoth
Relative costLower for C2–C3Competitive at C4–C5Highest
Typical systemZinc-rich epoxy + epoxy + polyurethaneZinc per ISO 1461Zinc + sweep blast or primer + epoxy + PU
Độ dày thépMinimum mean zinc thickness (ISO 1461)
Over 6 mm85 µm
3–6 mm70 µm
1.5–3 mm55 µm
Under 1.5 mm45 µm

Values for articles that are not centrifuged.

From our engineers

Galvanizing has to be designed into the drawings

Vent and drain holes. Closed hollow sections must have holes at both ends so air escapes and zinc drains. Without them, sections can burst in the bath. We place them in the shop drawings, sized per galvanizing design guides.
Kettle size sets length. A member longer than the kettle needs double dipping or a splice. Kettle size of our partner plant: to confirm.
Mixed thicknesses distort. Thin plate welded to thick plate heats unevenly and can warp. We flag such details for your engineer.
Chuẩn bị bề mặt

Most coating failures start before the first coat

The paint brand matters less than the surface it goes on.

Welded stainless steel fabricated parts
Bảo vệ chống cháy

How fire protection is specified

Intumescent coating

Thickness depends on the fire rating (R30–R120), the section factor (heated perimeter ÷ area) and the critical steel temperature. Products should carry a test assessment such as EN 13381-8 or UL 263.

Boards or spray

Often cheaper for R90–R120 and heavy sections; less tidy for exposed steel.

Concrete encasement

SRC and concrete-filled columns gain fire resistance from concrete cover.

Fix the rating before shop drawings. Intumescent thickness is calculated per section. A rating change later means re-calculation and often re-coating. Intumescent products and test reports we use: to confirm.
Transport and site

Damage happens. Plan the repair.

Câu hỏi thường gặp

Coating questions

Not answered here? Hỏi kỹ sư.

How long will shop primer protect steel before erection?

Primer alone is a short-term protection, typically months, not years, and less in humid coastal sites. Plan the full system or the erection date accordingly.

Galvanizing is done at partner plants under our inspection; to confirm.

The brand your specification names, for example Jotun, Hempel or International, with datasheets submitted for approval.

Yes, as a duplex system, after sweep blasting or a suitable primer so paint adheres to zinc.

Our coating inspector at each coat; your inspector at witness points. See Quality & Inspection.

Liên quan

Services and pages that connect to this one

Quality & Inspection

Service

Bulk storage (corrosive)

Sản phẩm

Industrial Plants

Sản phẩm

Packing & Shipping

Service
Coating proposal

Send the site location and required life

Without a specification, we propose a category, system and film thickness for your engineer to approve.