Industrial steel buildings designed around the crane, not the roof

In a crane hall the crane sets the column grid, the runway girders, the column step height and the foundations. If the crane data is wrong at the start, no later fix is cheap. This page lists what we need, the limits we design to and where plant frames usually go wrong.

185,550 m²

Largest plant delivered, Laos

12,600 t

Steel in one plant package

3

Overseas plants: Malaysia, Laos, Indonesia

50 tấn

Crane capacity designed

Fit

When a steel plant frame pays off

Steel suits plants that change. Lines move, cranes are upgraded and halls are extended.

A good fit when

Think twice when

Before design

Crane data we need from your crane supplier

Wheel loads cannot be estimated reliably from capacity. Each missing item below is an assumption in our price.

DataWhat it changesIf missing
Capacity and duty class (CMAA A–F, FEM / ISO, GB/T 3811 A1–A8)Fatigue design of runway girder and weldsWe assume a medium class; heavy use later can crack welds
Maximum wheel load and wheel spacingRunway girder size, bracket, columnEstimated; price changes when real data arrives
Span (rail centres) and hook heightColumn step level and building heightStep level error cannot be fixed after fabrication
End approach and buffer forcesEnd bay layout and stopsLost hook coverage at ends
Number of cranes per bayCombined loads on columnsUnder-designed columns for two cranes side by side
Future crane upgradeSpare capacity nowNew girders and columns later
Runway limits

Deflection and tolerance limits we design to

Kiểm traTypical limitSource
Vertical deflection, light and medium cranesSpan / 600CMAA 74, AISC Design Guide 7
Vertical deflection, heavy and high-cycle cranesSpan / 800 to / 1000AISC Design Guide 7
Lateral deflection, 10% of max wheel loadsSpan / 400CMAA 74
Rail alignment and gaugeCrane supplier toleranceAutomated cranes need tighter values
Column sway at eavePer code; cladding must accept itSlotted girt holes, sliding roof clips

Your project code may set different values (GB 50017 by crane working class, EN 1993-6). The stricter of code and crane supplier governs.

Column types

How the runway is carried

OptionSử dụng điển hìnhWatch out for
Bracket on portal columnLight cranes, about 5–10 tBracket eccentricity bends the column
Stepped columnTop-running cranes above about 16 tStep level set by hook height plus crane clearances
Laced or double columnHeavy cranes, 50 t and aboveMore nodes, more fabrication hours
Independent crane columnVibration isolation, heavy dutyTakes floor space
Underhung crane on roofLight loads, no columns neededRoof frame carries crane loads
From our engineers

Where crane buildings crack

Runway welds. Web-to-flange welds and stiffener ends see every wheel pass. We detail them to EN 1993-6 or AISC fatigue categories and avoid partial-penetration welds where stress reverses.
Brackets and splices. Bracket-to-column welds and girder splices are the common crack sites. Full-penetration welds there get 100% UT.
Unintended restraint. Bracing that restrains the girder end attracts forces it was not designed for. We release it with slotted connections where needed.
Plant types

What each plant type adds

Coating and access first

Pipe racks, platforms and duct openings are framed in the shop drawings. The corrosivity category sets the coating before member sizes are fixed.

Portal frame steel building with crane beams under erection

Clean, wide halls

Bottling and food plants need column-free halls and no ledges where dust gathers. Magelang in Indonesia is this type.

Steel factory interior with overhead crane and equipment

Heat, dust and heavy cranes

The Malaysian silicon metal plant used 12,000 t of steel for furnaces, heavy cranes and roof monitors.

Modern steel structure factory building exterior
Foundations and envelope

The crane also loads the ground

Crane columns carry large, repeated vertical and horizontal loads. Settlement between two runway columns tilts the rail.

Steel factory frame erection with aerial work platform
Cost drivers

What moves the price of a plant frame

Crane duty and tonnage

Heavier and more frequent cranes need deeper girders, fatigue details and heavier columns.

Coating category

A C5 system or galvanizing is a large share of the package on chemical plants.

Openings and platforms

Each framed opening and platform connection adds detailing and labour.

Piece length

Runway girders over 11.8 m need flat racks or splices.

Industrial projects

Plants we have supplied

Silicon Metal Main Plant

12,000 t · 142,100 m²
Malaysia

Lao International Tobacco Plant

12,600 t · 185,550 m²
Laos

Magelang Bottled Water Plant

2,600 t · 78,757 m²
Indonesia
Câu hỏi thường gặp

Industrial building questions

Not answered here? Hỏi kỹ sư.

Can you design without our crane data?

Yes, for a budget price, with stated assumptions. Final design waits for the crane supplier’s wheel loads and duty class.

No. We design and fabricate the runway girders, rails, stops and brackets, and coordinate with your crane supplier.

Yes, if we know the direction now. We reserve column capacity and design a removable gable.

We provide the scheme and calculations; a locally registered engineer usually checks and stamps them.

We erected plants in Laos and Indonesia. See Installation Support.

Các bước tiếp theo

Related pages

Warehouses & Logistics

Sản phẩm

H-beams & Plate Girders

Sản phẩm

Coating & Fire Protection

Service

Installation Support

Service
Send your plant layout

Get a scheme with crane bays sized

Process layout, crane data and site location are enough to start.