A hangar is sized from the aircraft, and its hardest member is the girder over the door. Above 40 m, truss depth, door loads and the lifting method decide cost more than tonnage. We plan all three with the scheme.

74 m

Largest single span on record

14,340 t

Naypyidaw stadium steel

36 m / 40 t

Atrium truss span / piece

100 m+

Space frame spans designed

Hangar sizing

Start from the aircraft, then add the future one

DimensionHow it is setPlanning margin
Clear door widthLargest wingspanPlus tip clearance each side, often 3 m or more
Clear door heightTail (fin) heightPlus clearance for tugs and jacking
DepthAircraft lengthPlus working space at nose and tail
Diện tích sànNumber of aircraftWorking hangars often 1.4–1.8 × aircraft footprint
Future aircraftFleet planExtra height and width are cheap now, expensive later

Clearances depend on the operator and local aviation rules. Planning values after published hangar design guides.

The door bay

How each hangar door loads the steel

The door supplier gives loads and the deflection limit for the door girder. Doors jam if the girder deflects more than the door can tolerate.

Door typeHow it loads the structureSteel detail affected
Sliding (multi-leaf)Weight on a floor track; wind and guidance at the topTop guide beam, door pockets at the sides
Bi-foldHangs from the header; load moves as it opensHeader girder, hinge supports
Hydraulic single panelLarge point loads at the hinge line and cylindersHinge girder, column reactions
Vertical lift / fabricHangs from the header; lifting gear on topHeader girder, access platform
Choose the door before the steel scheme. Changing door type later changes the header girder, the side columns and often the foundations.
Span systems

Which system for which span

Typical ranges. Roof loads, wind uplift and door openings move them.

SystemEconomic spanDepthPhù hợp nhất choWatch out for
Portal frameup to 36 mL/40–L/30Small hangars, shedsDeflection at the door
Plane trusses on columns30–80 mL/15–L/10Hangars, atriaLateral stability, transport length
Space frame40–120 mL/20–L/15Hangars, halls, domesMany nodes, survey control
Arch or curved truss50–150 mRise L/6–L/5Stadiums, stationsThrust at supports

Span-to-depth ratios are industry planning values.

Fire and services

What hangs from a hangar roof

NFPA 409 requirements depend on hangar group and size; confirm with the local fire authority.

Lắp dựng

Three ways to get a long-span roof up

Piece-by-piece lifting

Each truss lifted onto columns. Needs large cranes and temporary bracing.

Ground assembly and lift

Roof assembled on the ground and lifted in blocks by strand jacks.

Sliding

Sections assembled at one end and slid along rails where cranes cannot reach.

Decide the method in the scheme. It changes member forces, temporary works and splice positions. Door girders and long trusses are trial-assembled in our yard.
Large-span projects

Long spans we have delivered

Naypyidaw Stadiums 1–3

14,340 t · 96,000 m²
Myanmar

Trung tâm Đổi mới Nông nghiệp Hàng không Vũ trụ

74 m span
Quảng Châu

Meihua Aviation Atrium Trusses

36 m · 40 t piece
Quảng Đông
Câu hỏi thường gặp

Large-span questions

Not answered here? Hỏi kỹ sư.

Have you built an aircraft hangar?

Our large-span record is stadiums, factory atria and a 74 m greenhouse. The Meihua Aviation project was atrium trusses, not a complete hangar. The truss and space frame methods are the same.

The door supplier. We design the steel around its loads and deflection limit.

Yes, long-span trusses and door girders, to check camber, splices and supports before shipping.

About 11.8 m in a 40HQ, about 12 m on a flat rack, longer as break-bulk.

We provide the scheme and calculations; a local engineer usually checks and stamps them.

Các bước tiếp theo

Related pages

Dàn & Khung không gian

Sản phẩm

Roof & Wall Cladding

Sản phẩm

Steel truss types

Guide

Installation Support

Service
Large-span roof

Send the aircraft or use, and the site

We propose span system, door girder and lifting method with the estimate.