Steel structure manufacturer since 2009 · 8 fabrication bases in China
الرئيسية / Get a Quote
Send what you have. An engineer replies within 1 working day.
Complete drawings get a fixed BOM-based price. A brief or partial drawings get a scheme, a tonnage estimate and a list of what we assumed.
1 working day
First reply with questions or a price range.
3 working days
BOM quote for complete drawings up to 2,000 t.
اتفاقية عدم الإفشاء عند الطلب
We sign your NDA before you upload, if you need one.
Engineer, not sales
Drawings are reviewed by a structural engineer.
ماذا يحدث بعد ذلك
Acknowledgement
Reference number and the name of your engineer, same day.
Review
Drawings or brief checked for loads, grades, connections and coating.
Questions
An RFI list, or a call if it is faster. Nothing is guessed silently.
طلب عرض سعر
BOM by member type, scope matrix, exclusions, FOB or CIF price.
Technical call
We walk you through assumptions and options to reduce cost.
What a complete request includes
You do not need all of this to start. The more you send, the fewer assumptions we have to make, and the less the price moves later.
With drawings
- General arrangement and member schedules
- Connection details or design forces
- Steel grades and impact tests
- Weld, NDT and tolerance specification
- Coating and fire protection spec
- Delivery zones and dates
With a brief
- Plan size and clear height
- Use, racking, cranes, mezzanine
- Site city (for wind and seismic)
- Roof and wall finish preference
- Local design code if required
- Target budget or programme
About quoting
Can you quote from incomplete drawings?
Yes, as a budget price with listed assumptions. It becomes a fixed price once the missing items are confirmed.
Is the quote free?
Yes. Structural design beyond a preliminary scheme is quoted separately if you need it before an order.
Will my drawings be shared?
No. Drawings are used by our engineering team for your quote only. We sign your NDA on request before you upload.
Which currency and terms do you quote in?
USD as standard, FOB a Chinese port or CIF your port. Other currencies on request.
How long is a quote valid?
Usually 15–30 days, because steel prices move. The validity is stated on the quote.
What payment terms are normal?
Commonly 30% deposit and 70% against shipping documents, or by letter of credit. Large projects are paid by milestone.