Props. The deck carries wet concrete and workers between supports during the pour. Above about 2 m clear span, or for thick slabs, add a line of props. The deck table gives the limit per model.
Joints. Butt joints must be tight and supported so grout does not leak. Damaged boards are replaced, not patched.
Truss welds. Check the bar truss weld points and bar spacing on delivery; loose welds are rejected.
Services. Conduits run through the truss zone before the pour; holes cut later damage the board.