Case study · Industrial plant · Laos

Laos: 185,550 m² of factory, detailed to erected

A factory for Lao International Tobacco Group. GGSteel detailed, fabricated, shipped and cleared the steel, and erected it on site.

185,550 m²

Área del piso

12,600 t

Steel

Laos

Landlocked delivery

Erected

By GGSteel

Project overview

At a glance

ClientLao International Tobacco Group
UbicaciónLaos
Área del piso185,550 m²
Steel12,600 t
Nuestro alcance

What GGSteel did

Work itemAlcance
Steel detailing (shop drawings)GGSteel
FabricaciónGGSteel
Logistics / transportGGSteel
Customs clearanceGGSteel
Site erectionGGSteel

Scope as recorded in the GGSteel project register.

Structure

Large production and storage halls

Production and storage halls with long spans and controlled environments.

industrial steel frame 326
If you are planning something similar

Fix these early

Landlocked logistics. Sea freight plus overland trucking; member lengths set for road transport.
Border documents. Transit and import papers prepared ahead of each convoy.
Erection sequence. Planned to match the delivery convoys.
Relacionado

Products and services behind this project

Industrial Plants

Producto

Packing & Shipping

Service

Installation Support

Service

Fabrication to Drawings

Service
Similar project?

Delivering to a landlocked site?

Send drawings or a brief and we reply within 1 working day.