Inicio / Productos / Truss Floor Deck & Mezzanine

Floor & Envelope

Truss floor deck that stays in place, and mezzanines built on it

Our deck combines a steel bar truss with a fibre-reinforced base board that bonds to the slab. No formwork to strip, no plaster underneath. The questions buyers ask are about props, joints and approval, so this page answers those.

~28 kg/m²

Deck self-weight

1220 × 2440

Standard board size, mm

Clase A

Fire rating of base board

0.58 MPa

Bond strength to concrete

Deck options

How our deck compares

ÍtemTruss deck, fibre-cement base (ours)Truss deck on galvanized sheetProfiled metal deckTimber formwork
Formwork strippingNingunoNingunoNingunoRequired
Acabado del intradósPaint directlyExposed sheetExposed ribsPlaster needed
Clasificación contra incendios del intradósTablero Clase ANeeds protectionNeeds protection—
ProppingProps over about 2 m spansFew or noneBy spanFull props
Soffit corrosionNo steel exposedCoated sheetCoated sheet—
Specifications

Product data

ParámetroValorNota
Espesor de la placa base1.2 / 1.5 / 1.8 / 2.0Unit to confirm with datasheet
Altura de la cercha70 / 80 / 90 / 100Unit to confirm with datasheet
Standard board size1220 × 2440 mmCut to length
Peso propioAbout 28 kg/m²By model
Espesor mínimo de la losa100 mm
Bond strength to concrete0.58 MPaProduct test data
Base board fire ratingClase ANo combustible

Source: GGSteel product standard. Truss deck in China is also covered by JG/T 368.

On site

What decides a good pour

Props. The deck carries wet concrete and workers between supports during the pour. Above about 2 m clear span, or for thick slabs, add a line of props. The deck table gives the limit per model.
Joints. Butt joints must be tight and supported so grout does not leak. Damaged boards are replaced, not patched.
Truss welds. Check the bar truss weld points and bar spacing on delivery; loose welds are rejected.
Services. Conduits run through the truss zone before the pour; holes cut later damage the board.
Installation

From truck to finished ceiling

01

Entrega

Boards cut and labelled.

02

Lifting

Bundles lifted by tower crane.

03

Laying

Laid by hand, butt joints.

04

Servicios

Conduits through the truss zone.

05

Concrete

Slab poured; board bonds.

06

Finish

Soffit painted directly.

Mezzanine floors

Steel mezzanines for warehouses and plants

Free-standing or tied to the main frame, with stairs, handrails, pallet gates and the deck above. Designed for the floor load you declare, typically 3–10 kN/m².

metal floor deck installation 389
Preguntas frecuentes

Floor deck questions

Not answered here? Pregunte a un ingeniero.

Do I need props under the deck?

For clear spans over about 2 m, a line of props during the pour. Exact limits depend on deck model and slab thickness.

Yes. Paint or cover it without plastering.

The board is moisture-resistant; waterproofing is still done on the slab.

Subject to approval by your local engineer and authority. We provide the product standard and test reports.

Próximos pasos

Related pages

Cáscara Prefabricada PBS

Producto

Composite floors in towers

Producto

Floor deck selection guide

Guide

Mezzanine planning

Guide
Floor deck quote

Send floor areas, spans and slab thickness

We return deck model, quantities and propping layout.