CGN Engineering Headquarters: three towers on box SRC columns

Steel and concrete share every perimeter column in the towers. The difficulty was not tonnage; it was making rebar, studs and diaphragms fit inside the same section, thousands of times.

18,472 t

Total project steel

328,900 m²

Área del piso

26,800 m²

Site area

A, B, C towers

Plus podium

Project overview

At a glance

PropietarioChina General Nuclear Power Group (CGN)
UbicaciónNew Energy Base, Baolong, Longgang District, Shenzhen
Tipo de edificioOffice headquarters, 3 towers and podium
Structural systemTowers: box SRC columns with H-section SRC beams in the perimeter frame. Podium: concrete-filled steel tube columns with steel beams.
Total project steelAbout 18,472 t
Área del piso328,900 m²
Completion2021
Nuestro alcance

What GGSteel did

Work itemAlcance
Steel detailing (shop drawings)GGSteel
FabricaciónGGSteel
Transport to siteGGSteel
Site erectionGGSteel
Diseño estructuralDesign institute (client)
Concrete and rebarContratista principal

Scope as recorded in the GGSteel project register. Tonnage is the project total for the steel structure.

Engineering challenges

Three problems, and how they were solved

Challenge 01

Rebar through steel

Main bars of the SRC columns pass diaphragms and beam flanges. Every hole and coupler had to match the rebar drawings.

Challenge 02

Twist in heavy boxes

Thick-plate box columns with many diaphragms tend to twist during corner welding, which misaligns beam stubs.

Challenge 03

Tower-podium transition

Two structural systems meet at the podium roof, with different column types and connection forces.

From site

Construction photos

Tower steel erection
Records delivered

What the client received with the steel

The same data book we issue on every order, organised by tower, level and member mark.

If you are planning a similar project

Fix these early

What we would ask any client building an SRC high-rise to settle before shop drawings start.

Rebar drawings at the same revision as steel. Holes cannot be moved after the box is closed.
Splice levels set with the concrete contractor. Pour heights and splice heights must agree.
Fire strategy for exposed steel. Concrete cover protects SRC; the exposed parts still need a system.
Tower crane capacity. It sets the maximum piece weight and so the splice positions.
Relacionado

Products and projects behind this case

Columnas y vigas en caja soldadas

Producto

Commercial & High-rise

Producto

Fabrication to Drawings

Service

Zengcheng New World, 241 m

Proyecto
Building a high-rise frame?

Send the column and beam schedule

We will check SRC interfaces and splice positions with the quote, not after award.