Cost
Indicative 2026 FOB China prices per tonne and per m² by structure type, the six drivers behind every quotation, a 10,000 m² warehouse worked example and landed cost to nine markets.
Five working guides from our detailing, QC and logistics engineers. Indicative FOB prices, shop drawing checklists, GB / EN / ASTM equivalents, section selection and 40HQ loading, written for engineers and buyers who quote real projects.
The question we answer most often is “what does it cost per tonne?” This guide gives indicative FOB ranges for six structure types, from USD 1,100/t for simple purlins and portal frames to USD 1,800/t and above for multi-cavity mega columns.
It then converts tonnes into cost per m² using real steel-consumption tiers (32–45 kg/m² for single-storey warehouses, 55–95 kg/m² for multi-storey and heavy industrial) and walks through a full 10,000 m² warehouse estimate, including freight to Manila, Port Klang, Jakarta, Sydney, Jebel Ali and Lagos.
Each category starts with one in-depth guide. More articles are added as we publish project data.
Every figure comes from quotations, QC records and shipping files on real projects. Prices are indicative ranges and are confirmed per quotation.
Three short routes through the guides, depending on what you need to decide next.
Start with the cost guide to set a realistic budget, then read the loading guide to understand what lands on site and when.
Use the grade chart to approve Chinese-mill substitutions and the section guide to compare H and box options before you freeze the design.
Use the shop drawing guide to set what you expect in each submission, and the cost guide to check quotations line by line.
Every guide answers a question we get on real enquiries: what the steel costs, what drawings to expect, which grade to accept, which section to use and how it ships. Read them in any order. Each one links to the product, service and project pages behind the numbers, so you can check how the figures were reached.
Request any of these through the quote form. Name the file you want in the message field and we email it the same working day.
Excel + PDF. Enter length, width and eave height to get a tonnage range and an indicative FOB budget.
Desensitized PDF: GA, anchor bolt plan, erection, assembly and part drawings with a matching BOM.
GB / EN / ASTM / AS grade equivalents, bolt grades and weld inspection levels on two pages.
The authors are the engineers who detail, inspect and ship our steel. Cost figures come from FOB quotations issued in 2025–2026. Grade data comes from mill test certificates we check every week. Loading figures come from packing lists for containers shipped from Shenzhen and Guangzhou.
Where a number depends on the project, we give a range and say what moves it. For a firm figure, send drawings and our Tekla detailing team returns a BOM and FOB price within 24 hours.
We update each guide when plate prices, freight rates or standards change, and the date at the top of every article shows the last review. If a figure in a guide does not match your quotation, ask us why: the answer is usually coating, connection type or shipping length, and we will show the difference line by line.
Questions about a specific project? Our engineers reply within 24 hours.
No. They are indicative FOB China ranges based on 2025–2026 quotations. Steel plate prices, coating systems and complexity move the figure. We confirm a firm price per project after reviewing your drawings.
Yes. Request it through the quote form and note “sample drawing set” in the message. We send a desensitized PDF set by email, usually the same working day.
We reference AISC 360, EN 1993 and AS 4100 for design, GB 50017 and GB 50205 for Chinese practice, and EN 10204 3.1 for material certificates.
Yes. Send IFC, DWG, Tekla or PDF drawings. Our engineers check tonnage, connection types and shipping lengths and suggest changes that reduce cost before fabrication starts.
DWG, IFC, Tekla or PDF. Engineering review by our Tekla team, from 50 t or 2,000 m².