24–90 m clear spanTrusses pre-assembled to 90 mMeihua Aviation 36 m

Long-Span Steel Aircraft Hangars & Aviation Facilities

Column-free steel hangars, MRO buildings and aviation training halls with 24–90 m clear spans. Door-head girders and roof trusses trial-assembled in the shop, fabricated in Guangdong and shipped FOB in 25–50 days.

90 mShop trial assembly length
74 mMax. single span delivered
~40 tSingle truss weight, Meihua project
25–50 daysFabrication lead time
01Who this is for

Steel aircraft hangars for airports, operators and MRO contractors

Airports, flight schools, MRO providers and general aviation operators need large, column-free floor space with very little room for error at the door line. A steel roof is the only practical way to clear 36–90 m with a single span.

We supply the full structural package: primary trusses or space frame, door-head girder, gable and side columns, bracing, roof purlins, crane and dock support steel, and mezzanine floors for workshops and offices along the side walls.

  • Single-plane trusses, two-way truss grids and space frames
  • Door-head box girders sized for sliding or vertical-lift doors
  • Side mezzanines on truss floor deck for stores and offices
  • Coastal-grade coating for airports near the sea
Long-span roof truss being erected
02Structural breakdown

Structural breakdown of a steel hangar

Each member family links to its product page with section ranges and processing limits.

Pipe, box and H-section trusses, trial-assembled up to 90 m with camber control.

Welded box or plate girder spanning the door opening with tight deflection limits.

Box and tubular columns for back and side walls, and wind posts at the gables.

Heavy bearing and connection nodes where trusses meet columns and the door girder.

Truss floor deck for workshop, store and office floors along the hangar walls.

Galvanized purlins, access stairs and maintenance platforms.

03Steel consumption & cost

Hangar cost: three tiers by span

Span and door height drive steel consumption more than floor area does.

TierTypical scopeSpan / heightSteel consumptionIndicative FOB ChinaLoading
Tier 1: light aviationTrainers, helicopters, small GA hangar24–36 m / door 5–8 m32–45 kg/m²USD 1,150–1,350/t22–24 t per 40HQ
Tier 2: business jet / turbopropTruss roof, door girder, side mezzanine36–60 m / door 9–13 m55–95 kg/m²USD 1,300–1,550/tMixed container / break-bulk
Tier 3: narrow / wide-body MROSpace frame or deep trusses, docks and cranes60–90 m / door 13–22 mCalculated per drawingsUSD 1,450–1,700/tBreak-bulk for truss segments

Indicative ranges for budgeting, based on recent South China project data. Final tonnage and price are confirmed per quotation from your drawings, loads and coating specification.

Example: a 60 × 50 m business jet hangar at about 75 kg/m² needs roughly 225 t of steel, around USD 290,000–350,000 FOB for the frame. Doors, cladding and erection are extra. See the container vs break-bulk guide for truss shipping.
{04}Design basis

Hangar spans and door heights by aircraft class

Aircraft classTypical clear spanDoor clear heightRoof system
Light aircraft, helicopters, trainers24–36 m5–8 mTapered portal frame or single-plane truss
Turboprop, business jets (e.g. ATR 72, Gulfstream)36–50 m9–12 mPipe or H-section trusses, door-head box girder
Narrow-body (A320, B737)50–70 m13–15 mSpace frame or two-way truss grid, heavy door girder
Wide-body (A330, B787)75–90 m19–22 mSpace frame or deep trusses, trial-assembled to 90 m

The hangar door decides the structure. A column-free door opening of 50–90 m means the front edge of the roof is carried by a deep door-head girder or truss, and its deflection must stay inside the door supplier’s tolerance, often 50 mm or less under wind and snow.

We fabricate door-head girders as welded box or plate girders, and the roof as pipe trusses or space frames. Every truss is trial-assembled in the shop, surveyed for camber and match-marked, so the roof closes without forcing members on site.

Hangars often carry suspended loads: maintenance docks, cranes of 5–10 t and fire suppression mains. We include their support steel in the model so the roof is checked once, with all loads.

05Reference projects

Aviation and long-span projects

A 36 m aviation training atrium near Guangzhou Baiyun Airport, backed by our 74 m long-span record.

43 patents: 5 invention, 32 utility, 6 design
ISO 9001 / 14001 / 45001
100% UT on CJP welds
MTC to EN 10204 3.1
National High-Tech Enterprise
06Delivery method

Four steps that make site assembly predictable

  1. 01

    Tekla load model and shop drawings

    Your design is modelled in Tekla Structures, connections are checked to AISC 360, EN 1993 or AS 4100, and you approve shop drawings before any plate is cut.

  2. 02

    Shop trial assembly and hole check

    Frames, trusses and splices are laid out in the yard, surveyed and match-marked so bolt holes line up on site.

  3. 03

    Piece-mark stamping

    Every member carries a steel-stamped piece mark that matches the erection drawings and the packing list.

  4. 04

    Protected packing and loading

    Members are bundled on steel saddles with timber separators, loaded to a container plan or break-bulk stowage plan, and shipped FOB Shenzhen or Guangzhou.

Fabricated truss segment before shipping
07FAQ

What buyers ask before ordering

Long-span roofs are also covered under steel warehouse buildings and steel bridges and skywalks.

What to send for a 24h quote

  • Design aircraft type, hangar length and width, and door clear height
  • Door type and supplier loads (sliding, vertical-lift or fabric door)
  • Suspended loads: cranes, maintenance docks, fire suppression mains
  • Design code, wind, seismic and snow data for the site
  • Coating or galvanizing specification and fire rating, if any
  • Destination port and the date you need the steel on site
What is the largest hangar span you can supply?

We trial-assemble trusses up to 90 m in the shop, which covers wide-body hangars. Our largest delivered single span to date is 74 m.

Yes. We size the door-head girder to the door supplier’s loads and deflection limits, and coordinate rail and guide details in the Tekla model.

Trusses are split into segments, usually 11.8 m for 40HQ containers or up to 24 m by break-bulk, with bolted or welded splices that were fitted during trial assembly.

Yes, bolted-ball and welded-hollow-sphere space frames as well as pipe trusses. The choice depends on span, roof shape and erection method.

Yes. Suspended cranes of 5–10 t and maintenance docks are included in the roof design loads and their runway steel is fabricated with the roof.

25–40 days for standard frames, up to about 50 days for space frames and heavy door girders after shop drawing approval.

Send your hangar size and door height. Get a 24-hour BOM.

Aircraft type, span, door clear height and port are enough to start.