1. Home
  2. Services
  3. BIM Steel Detailing
Tekla StructuresLOD 350–400AISC 360 / EN 1993 / AS 4100IFC · DWG · NC1

BIM Structural Steel Detailing, Node Optimization & Shop Drawings

Our in-house detailing team turns your design drawings into a Tekla Structures model, checked connections, shop drawings, NC files and a weight-accurate BOM. First issue in 5–10 working days.

01Structural steel detailing

One model drives drawings, CNC and the BOM

Detailing is where a design becomes a buildable steel package. We model every member, plate, bolt and weld in Tekla Structures, then generate drawings and machine files straight from the model. Nothing is redrawn by hand, so the drawing, the NC file and the weight on the BOM always agree.

The team works on box columns, plate girders, pipe and box trusses, multi-cavity mega columns and secondary steel. Typical packages run from 50 t mezzanines to towers above 18,000 t. For complex nodes we model weld access, bevel types and assembly sequence, because a node that cannot be welded in the shop will not be welded on site either.

  • Input: IFC, DWG, DXF, PDF, Revit export or Tekla model
  • Connection design to AISC 360, EN 1993-1-8 or AS 4100
  • Clash check against architectural and MEP models when supplied
  • BOM accuracy within 2% of final shipped weight
Connection-level Tekla model
02Level of development

LOD 300 to LOD 400, matched to the stage

We agree the LOD at kick-off so the model carries enough detail for its next user and no more.

LevelWhat is modelledTypical use
LOD 300Members at correct size, grade and position. No connection plates.Tender take-off, early BOM, design coordination
LOD 350Connections, base plates, splices, stiffeners and embeds positionedClash check with MEP and facade, RFIs
LOD 400Every plate, bolt, weld, bevel, hole and camber. Assembly marks.Shop drawings, NC files, fabrication and erection
LOD 500 (as-built)Model updated with approved site changes and survey dataHandover to owner, facility management

Default scope is LOD 400 for fabrication. LOD 300 models are issued free with tender BOMs for projects we quote.

03Deliverables

What the detailing package contains

General arrangement drawings

Plans, elevations and sections with erection marks, grid lines and setting-out levels.

Assembly drawings

One sheet per shipping piece: dimensions, welds, bolts, camber and paint zones.

Single-part drawings

Plates and profiles with holes, bevels and cut-outs for the workshop.

NC / DSTV files

NC1 files for drilling, sawing and plasma lines. DXF nesting for plate cutting.

BOM and weight report

Tonnage by member type, grade and area. Bolt and stud lists. Paint surface area.

Connection calculations

Bolt and weld checks for typical and special connections, with design forces stated.

Clash report and RFI log

Clashes, design gaps and questions listed with screenshots and proposed answers.

IFC model

Coordination model for your BIM manager, viewable in Navisworks, Solibri or Trimble Connect.

04Drawing review timeline

From design drawings to approved shop drawings

A 300–800 t package typically reaches approval within three weeks. Larger projects are split into areas or sequences so fabrication can start on the first area while the rest is still being detailed.

Approval of shop drawings starts the fabrication clock: 25–40 days for standard members, 40–60 days for complex multi-cavity and twisted members.

Model split into erection sequences
  1. D1

    Kick-off and design review

    Codes, grades, loads and connection design responsibility confirmed. LOD and drawing standard agreed.

  2. D2–3

    RFI list issued

    Missing dimensions, unclear connections and design conflicts raised in one log, not one email at a time.

  3. D3–7

    Modelling and connection design

    Members, connections and embeds modelled. Clash check run against supplied models.

  4. D8–10

    First issue for approval

    GA, assembly drawings and connection calcs issued as PDF plus IFC.

  5. +3–5 d

    Client comments closed

    Comments returned in a marked-up PDF are incorporated and re-issued within 2–3 working days.

  6. Approved

    Issued for construction

    NC files released to the workshop. Fabrication lead time starts.

05File formats

We read what your consultant issues

If your design team works in Revit, SAP2000, ETABS, STAAD or Robot, send the drawings and an IFC export. Analysis results help us size connections.

FormatDirectionUsed for
IFC 2×3 / IFC4In and outDesign model import, coordination model export
Tekla (.tsep, model folder)In and outNative exchange with Tekla users, model handover
DWG / DXFIn and outDesign drawings, GA drawings, plate nesting
PDFIn and outDesign drawings, shop drawing approval, mark-ups
NC1 (DSTV)OutCNC drilling, sawing and coping lines
KSS / CSV / XLSXOutBOM, MIS import, bolt and paint lists
Revit (via IFC)InArchitectural and MEP coordination
06Sample deliverables

What a typical package looks like

Want to see the sheet layout before you send drawings? Download our sample set.

Project typeTonnageDrawing sheets (approx.)First issue
Single-storey PEB warehouse, 30 m span300 t120–1805 working days
Multi-storey logistics building1,500 t600–9008–10 working days, by zone
Long-span pipe truss roof, 74 m800 t400–60010 working days
High-rise core and frame, mega columns7,000 t+3,000+Staged by floors, 10 days per stage
Skybridge or link bridge200–700 t150–3007 working days

Indicative values from past packages. Actual sheet count depends on repetition and drawing standard.

07Node optimisation

Connections designed for the workshop and the crane

Connections drive cost more than tonnage does. A moment connection with full-penetration flange welds costs several times a bolted end plate. During detailing we propose alternatives where the design allows, and we flag where it does not.

  • Standardise bolt sizes and plate thicknesses to cut variety on site
  • Move welds to the shop and bolts to the field where possible
  • Size splices for 11.8 m containers or the agreed crane capacity
  • Check weld access and sequence on multi-cavity mega columns
  • Camber and pre-set on long-span trusses and transfer girders

On the CGN Headquarters, multi-cavity column nodes were modelled with weld sequence and inspection access before release. See our complex nodes and box column pages for processing limits.

Fabricated beam-column node
08FAQ

Detailing questions

Next step after approval: fabrication, coating and testing. See coating and fireproofing and quality, NDT and shipping.

How much does steel detailing cost?

Detailing is usually priced per tonne of modelled steel, roughly USD 25–60/t depending on complexity. When we also fabricate the steel, detailing is included in the fabrication price.

This is agreed at kick-off. We can design connections to AISC 360, EN 1993-1-8 or AS 4100 using your design forces, or detail connections already designed by your engineer of record.

Yes. PDF design drawings are enough for modelling. An IFC or analysis model shortens the RFI stage, because member positions and forces can be read directly.

Changes are logged with a revision cloud and revision letter. The model, drawings, NC files and BOM are updated together, and the change log shows the tonnage impact.

Yes. The IFC model is part of every package. The native Tekla model can be handed over at project end on request.

Send your drawings. Get a 24-hour BOM and FOB price.

DWG, IFC, Tekla or PDF. Engineering review by our Tekla team, from 50 t or 2,000 m².