Shanwei · 7,000 t
Xiangxue Health Industrial Park: single-storey steel plant, 30.6 m single span, 9.3 m column spacing, 124,700 m².
Factories, process plants and heavy workshops with crane runways up to 50 t, column grids to 36 m and full mezzanine floors. Designed and detailed in Tekla, fabricated in Guangdong, shipped FOB in 25–40 days.
Manufacturers building a new plant want two things from the structure: an early roof so equipment installation can start, and a frame that carries cranes, platforms and services without later strengthening. Steel delivers both.
We supply production halls, pharmaceutical and food plants, electronics and battery material workshops, maintenance buildings and multi-storey “industry upstairs” factories. The package covers the main frame, crane runway beams, bracing, mezzanines, platforms, stairs and the secondary steel for cladding.
Each member family links to its product page with section ranges and processing limits.
Welded H-sections and plate girders to 3,000 mm deep for rafters, runways and transfer beams.
Steel-bar truss deck for office, packing and production floors, no temporary props.
Equipment platforms, access stairs, handrails, galvanized C/Z purlins and girts.
Precast shell elements for concrete office or utility blocks attached to the plant.
Crane capacity, span and number of storeys decide which tier your project falls into.
| Tier | Typical scope | Span / height | Steel consumption | Indicative FOB China | Loading |
|---|---|---|---|---|---|
| Tier 1: light workshop | Single span, no crane or crane up to 5 t | 18–30 m / eave 8–10 m | 32–45 kg/m² | USD 1,100–1,300/t | 22–25 t per 40HQ |
| Tier 2: crane plant | Multi-span, 10–50 t cranes, platforms | 24–36 m / eave 10–18 m | 55–95 kg/m² | USD 1,250–1,500/t | 20–23 t per 40HQ |
| Tier 3: multi-storey / long span | Industry upstairs factories, 48–74 m truss halls | To 74 m or 4–16 storeys | Calculated per drawings | USD 1,350–1,650/t | Break-bulk for girders over 11.8 m |
Indicative ranges for budgeting, based on recent South China project data. Final tonnage and price are confirmed per quotation from your drawings, loads and coating specification.
| Crane capacity | Runway beam | Column type | Typical steel consumption |
|---|---|---|---|
| 3–10 t (light duty) | Welded H 600–900 mm, on brackets | Tapered H or uniform H | 45–60 kg/m² |
| 16–32 t (medium duty) | Welded H 900–1,500 mm with surge girder | Stepped H or laced column | 60–80 kg/m² |
| 50 t and above (heavy duty) | Plate girder 1,500–2,500 mm or box girder | Laced or box column | 80–95+ kg/m² |
Overhead cranes change everything in an industrial building. Wheel loads govern the runway beam, the column steps up to carry the rail, and fatigue governs the weld details. We fabricate runway beams as welded plate girders with full-penetration top flange welds, 100% ultrasonically tested, and mill the bearing ends for clean load transfer.
For process plants, the steel also carries pipe racks, equipment platforms, ventilation fans and roof monitors. We model these in the same Tekla file, so platform and pipe-support steel arrives with the frame instead of as a site variation.
Plants with corrosive processes, such as chemicals or battery materials, need epoxy or galvanized systems. Specify them early through coating and galvanizing.
Two very different plants: a 7,000 t pharmaceutical park and a 74 m span agricultural innovation hall.
Xiangxue Health Industrial Park: single-storey steel plant, 30.6 m single span, 9.3 m column spacing, 124,700 m².
China Aerospace Agricultural Innovation Center: 23 m high steel and membrane hall with a 74 m maximum span.
Your design is modelled in Tekla Structures, connections are checked to AISC 360, EN 1993 or AS 4100, and you approve shop drawings before any plate is cut.
Frames, trusses and splices are laid out in the yard, surveyed and match-marked so bolt holes line up on site.
Every member carries a steel-stamped piece mark that matches the erection drawings and the packing list.
Members are bundled on steel saddles with timber separators, loaded to a container plan or break-bulk stowage plan, and shipped FOB Shenzhen or Guangzhou.
Related: steel warehouse buildings and build-to-print structural steel fabrication.
We detail and fabricate runway beams to your engineer’s design, or check them to AISC 360, EN 1993 or AS 4100 with the crane supplier’s wheel loads. All flange-to-web CJP welds receive 100% UT.
Light workshops use 32–45 kg/m². Plants with 10–50 t cranes use about 55–95 kg/m². Multi-storey factories and 48 m+ truss halls are calculated per drawings.
Yes, on request we supply roof and wall sandwich panels, flashings and skylights with the steel, or we provide girts and purlins only for local cladding.
Yes. We supply box columns, H-beams and truss floor deck for 4–16 storey industrial buildings designed for heavy floor loads and goods lifts.
25–40 days of fabrication after shop drawing approval. Large plants are delivered in batches that follow your erection sequence.
We send erection supervisors to any market. In Southeast Asia, our subsidiary PT Pemasangan Baja Struktur Xianghe provides full installation crews.
Span, bays, crane capacity and port are enough to start. From 2,000 m² or 50 t.