1. Home
  2. Request a Quote
24h BOM & FOB quoteNDA on requestReply from an engineer, not a sales desk

Request a Quote: Drawings In, BOM and FOB Price Out in 24 Hours

Upload structural drawings and our Tekla detailing team returns a material take-off, tonnage and indicative FOB price. Projects from 50 t of steel or 2,000 m² of building area.

01Before you upload

What to send for an accurate quote

Drawings alone are enough to start. The four items below let us price without assumptions.

Structural drawings

General arrangement, sections and connection details in DWG, DXF, PDF or IFC. A Tekla model (.db1) gives the fastest and most accurate take-off.

Steel grade & design code

Q355B, S355JR, ASTM A572 Gr.50 or your specified grade, plus the code for connections: AISC 360, EN 1993 or AS 4100.

Coating & fire spec

Blast standard, primer and topcoat DFT, hot-dip galvanizing or intumescent rating. If unspecified we propose a C3/C4 system.

Delivery port & date

Destination port, Incoterm (FOB, CFR or CIF) and the date steel is needed on site. We plan fabrication backwards from it.

Only have a concept or architectural drawings? Send them anyway. We return a budget estimate based on typical steel consumption: 32–45 kg/m² for single-storey warehouses and 55–95 kg/m² for multi-storey or heavy industrial frames. See our 2026 steel cost guide.

Global inquiry

Your drawings go straight to the detailing team.

Every inquiry is reviewed by our Tekla detailing team. Send structural drawings and we return a material take-off, tonnage estimate and FOB price within 24 hours.

  • WhatsApp / Phone+86 189 3823 9988
  • ResponseWithin 24 hours, Monday to Saturday (GMT+8)
  • Head officeBuilding 2, Kaida Technology Design Center, Nancheng District, Dongguan, Guangdong, China

Upload drawings for a 24-hour BOM quote

Your drawings are used only for quotation and are covered by NDA on request. See our Privacy Policy.

02After you submit

What happens in the next 24 hours

Most packages follow this sequence. Large or complex packages (multi-cavity nodes, 90 m trusses) take 2–3 working days.

0h

Receipt confirmed

An automatic email confirms your files arrived and gives you a project reference number.

2h

Engineer assigned

A detailing engineer checks the files are complete and contacts you only if something critical is missing.

8h

Model & take-off

Members are modelled or measured, grouped by section and grade, and weighed with connection allowance.

16h

Pricing

Material, fabrication, coating, packing and inland freight to Shenzhen or Guangzhou port are costed.

24h

Quote issued

You receive the BOM, tonnage, FOB price and a lead-time plan by email, with a call offered to walk through it.

03What you receive

A quote you can put in front of your client

We price from your drawings, not from a rate card. The quote breaks the steel down so you can check our weight against yours and compare it with other bids on equal scope.

DocumentWhat it containsUse it for
Bill of materials (BOM)Member list by section, grade, length and piece weight; plates and bolts listed separatelyChecking scope against your design
Tonnage summaryNet steel weight plus connection allowance, split by primary, secondary and deckComparing bids on equal weight
FOB pricePrice per tonne and lump sum, Shenzhen or Guangzhou port; CFR/CIF on requestBudget approval and tender submission
Lead-time planDetailing 5–10 working days, fabrication 25–40 days after shop drawing approval, sea transit by routePlanning your site program
Technical clarificationsAssumptions on grade, coating, connections and tolerances, with any RFIsClosing gaps before contract

Indicative FOB China structural steel prices currently run roughly USD 1,100–1,800/t depending on complexity, coating and tonnage. Every figure is confirmed in the written quotation.

Section stock, Guangdong base
04Confidentiality

Your drawings stay with the estimating team

Drawings are used only to prepare your quotation. They are stored on access-controlled servers, are not shared outside Guiguan Group, and are never passed to other bidders. We sign your NDA, or send ours, before you upload if your project requires it.

  • Mutual NDA signed within one working day on request
  • Files deleted on request if the project does not proceed
  • Details in our Privacy Policy
ISO 9001:2015
ISO 14001:2015
ISO 45001:2018
EN 10204 3.1 MTC
100% UT on CJP welds
43 patents
8 manufacturing bases
National High-Tech Enterprise

Certificates and test reports are listed on our certifications page. Third-party inspection by SGS, BV or TUV is welcome at any stage.

05FAQ

Quoting questions

Prefer to talk first? Message an engineer on WhatsApp or email [email protected].

Is the 24-hour quote binding?

The 24-hour quote is an indicative FOB price based on the drawings received. It becomes binding when we issue the formal quotation with validity date, usually within 2–3 working days after clarifications.

Our MOQ is 50 t of steel or 2,000 m² of building area. Smaller packages, such as stairs or platforms, can be added to a larger order or consolidated into one shipment.

Yes. We apply standard connection allowances (typically 6–10% of member weight) and list them as assumptions. Our detailing team can design connections to AISC 360, EN 1993 or AS 4100.

We quote erection supervision for any market. In Indonesia and Southeast Asia, our subsidiary PT Xianghe can quote full installation crews. Civil works and foundations are by others.